Citation: | Li Hao, Sun Baojiang, Gao Yonghai, Wang Jintang, Wang Ning. Design and Calculation of Hydraulic Parameters for Controlling Mud Cap in Deepwater Drilling[J]. Petroleum Drilling Techniques, 2013, 41(3): 13-18. DOI: 10.3969/j.issn.1001-0890.2013.03.003 |
[1] |
Fossli B,Sangesland S.Controlled mud-cap drilling for subsea applications:well-control challenges in deep waters[J].SPE Drilling Completion,2006,21(2):133-140.
|
[2] |
王子健.控制泥浆帽压力钻井工艺技术研究.东营:中国石油大学(华东)石油工程学院,2009. Wang Zijian.Study of controlled mud cap drilling technology.Dongying:China University of Petroleum(Huadong),School of Petroleum Engineering,2009.
|
[3] |
郝希宁,汪志明,薛亮,等.泥浆帽控压钻井裂缝漏失规律[J].石油钻采工艺,2009,31(5):48-51. Hao Xi’ning,Wang Zhiming,Xue Liang,et al.Study on lost circulation methods in mud cap managed pressure drilling[J].Oil Drilling Production Technology,2009,31(5):48-51.
|
[4] |
周泊奇,柳贡慧,李军.泥浆帽理想井底压力模型研究初探[J].钻采工艺,2008,31(6):4-7. Zhou Boqi,Liu Gonghui,Li Jun.Research on floating mud cap bottom hole pressure model[J].Drilling Production Technology,2008,31(6):4-7.
|
[5] |
孙凯,梁海波,李黔,等.控压钻井泥浆帽设计方法研究[J].石油钻探技术,2011,39(1):36-39. Sun Kai,Liang Haibo,Li Qian,et al.Research on mud cap design of managed pressure drilling[J].Petroleum Drilling Techniques,2011,39(1):36-39.
|
[6] |
Erick R.Case history of floating mud cap drilling techniques:Ardalin field,Timan Pechora basin,Russia.SPE/IADC 29423,1995.
|
[7] |
Beltran J C,Gabaldon O,Puerto G,et al.Case studies:proactive managed pressure drilling and underbalanced drilling application in San Joaquin Wells,Venezuela.SPE 100927,2006.
|
[8] |
Soto R,Malavé J,Medina M,et al.Managed pressure drilling (MPD): planning a solution for San Joaquin Field,Venezuela.IADC/SPE 99116,2006.
|
[9] |
Medley G H,Reynolds P B B.Distinct variations of managed pressure drilling exhibit application potential[J].World Oil,2006,227(3):41-44.
|
[10] |
Harris O O,Osisanya S O.Evaluation of equivalent circulating density of drilling fluids under high-pressure/high-temperature conditions.SPE 97018,2005.
|
[11] |
管志川.温度和压力对深水钻井油基钻井液液柱压力的影响[J].石油大学学报:自然科学版,2003,27(4):48-52,57. Guan Zhichuan.Effect of temperature and pressure on fluid column pressure of wellbore drilling fluid in deep-water drilling with oil-based drilling fluid[J].Journal of the University of Petroleum,China:Edition of Natural Science,2003,27(4):48-52,57.
|
[12] |
姚晓,周保中,赵元才,等.国内油气田漏失性地层固井防漏技术研究[J].天然气工业,2005,25(6):45-48. Yao Xiao,Zhou Baozhong,Zhao Yuancai,et al.Leak resistance techniques of thief zone cementing in domestic oil and gas fields[J].Natural Gas Industry,2005,25(6):45-48.
|
[13] |
Urselmann R,Cummins J,Worrall R N,et al.Pressured mud cap drilling:efficient drilling of high-pressure fractured reservoirs.SPE/IADC 52828,1999.
|
[14] |
Power D,Ivan C D,Brooks S W.The top 10 loss circulation concerns in deepwater drilling.SPE 81133,2003.
|
[15] |
Runtuwene M,Suprihono S,Rizka D,et al.Pressurized mud cap drilling drastically reduces non-productive time in Soka Field,South Sumatera.SPE 125311,2009.
|
[16] |
Santos H,Sonnemann P,Kozicz J,et al.Optimizing and automating pressurized mud cap drilling with the micro-flux control method.SPE 116492,2008.
|
[17] |
刘希圣,蒋金纯.关于确定合理环空返速问题的探讨[J].石油钻采工艺,1984,6(2): 1-12. Liu Xisheng,Jiang Jinchun.Discussion on the reasonable annular return speed[J].Oil Drilling Production Technology,1984,6(2):1-12.
|
[18] |
徐同台,刘玉杰.钻井工程防漏堵漏技术[M].北京:石油工业出版社,1997:6-7. Xu Tongtai,Liu Yujie.Drilling engineering lost circulation resistance and control technology[M].Beijing: Petroleum Industry Press,1997:6-7.
|
[19] |
金衍,陈勉,刘晓明,等.塔中奥陶系碳酸盐岩地层漏失压力统计分析[J].石油钻采工艺,2007,29(5):82-84. Jin Yan,Chen Mian,Liu Xiaoming,et al.Statistic analysis of leakage pressure of Ordovician carbonate formation in middle Tarim Basin[J].Oil Drilling Production Technology,2007,29(5):82-84.
|
[20] |
Fossli B,Sangesland S,Rasmussen O S,et al.Managed-pressure drilling;techniques and options for improving efficiency,operability,and well safety in subsea TTRD.OTC 17798,2006.
|