Design and Laboratory Test of Hierarchical Intelligent Control System for Managed Pressure Drilling[J]. Petroleum Drilling Techniques, 2011, 39(4): 13-18. DOI: 10.3969/j.issn.1001-0890.2011.04.003
Citation: Design and Laboratory Test of Hierarchical Intelligent Control System for Managed Pressure Drilling[J]. Petroleum Drilling Techniques, 2011, 39(4): 13-18. DOI: 10.3969/j.issn.1001-0890.2011.04.003

Design and Laboratory Test of Hierarchical Intelligent Control System for Managed Pressure Drilling

More Information
  • Received Date: November 10, 2018
  • Revised Date: November 10, 2018
  • Related Articles

    [1]LIU Xing, QIU Jian, CHEN Zuo, ZHANG Xudong, LI Shuangming, QI Zili. Calculation Method for Complex Fracture Network Area of Shale Fracturing Based on Octree Grid[J]. Petroleum Drilling Techniques, 2024, 52(6): 117-125. DOI: 10.11911/syztjs.2024101
    [2]ZHANG Guilin. Modification of the Relative Time Method Calculation Formula for Oil and Gas Up-Channeling Velocity[J]. Petroleum Drilling Techniques, 2024, 52(1): 32-37. DOI: 10.11911/syztjs.2023102
    [3]LIU Hui, DING Xinlu, ZHANG Shijie, FANG Yungui, HAO Xiaobo, ZHENG Weige. Integrated Calculation Method of Pressure and Formation Parameters in Gas Injection Process of Underground Gas Storage[J]. Petroleum Drilling Techniques, 2022, 50(6): 64-71. DOI: 10.11911/syztjs.2022047
    [4]LI Cui, GAO Deli, LIU Qinglong, KONG Xue. A Method of Calculating of Avoiding Collisions with Adjacent Wells Using Electromagnetic Ranging Surveying while Drilling Tools[J]. Petroleum Drilling Techniques, 2016, 44(5): 52-59. DOI: 10.11911/syztjs.201605009
    [5]LIU Xiuquan, LI Jiayi, REN Keren, XU Liangbin, CHANG Yuanjiang, SONG Qiang. A Calculation Method for the Top Tension of Deepwater Drilling Risers Based on Recoil Response[J]. Petroleum Drilling Techniques, 2016, 44(4): 47-51. DOI: 10.11911/syztjs.201604009
    [6]ZHOU Bo, YANG Jin, ZHOU Jianliang, LIU Zhengli, YANG Jiangang. A Jetting Flow Rate Design Method for Conductor Installation through Jetting in Deepwater Drilling[J]. Petroleum Drilling Techniques, 2016, 44(3): 21-26. DOI: 10.11911/syztjs.201603004
    [7]Wang Lei, Zhang Hui, Zhou Yuyang, Ke Ke, Zhang Jinshuang, Peng Xing. Optimal Design of Hydraulic Parameters for Conductor Jetting in Deepwater Drilling[J]. Petroleum Drilling Techniques, 2015, 43(2): 19-24. DOI: 10.11911/syztjs.201502004
    [8]Li Longlong, Wu Minglu, Yao Jun, Li Yang, Li Xiaoxue. Calculation Method of the Productivity of Partially Perforated Vertical Well[J]. Petroleum Drilling Techniques, 2014, 42(3): 80-89. DOI: 10.3969/j.issn.1001-0890.2014.03.016
    [9]Diao Binbin, Gao Deli. Calculation Method of Adjacent Well Oriented Separation Factors[J]. Petroleum Drilling Techniques, 2012, 40(1): 22-27. DOI: 10.3969/j.issn.1001-0890.2012.01.005
    [10]Research on Mud Cap Design of Managed Pressure Drilling[J]. Petroleum Drilling Techniques, 2011, 39(1): 36-39. DOI: 10.3969/j.issn.1001-0890.2011.01.008

Catalog

    Article Metrics

    Article views (2825) PDF downloads (3055) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return