Cheng Zhong, Zhang Junbin, Liu Zhengli, Mou Xiaojun, Cheng Kun. Design and Application of Frac-Pack Completion String for Deep-Water Wells[J]. Petroleum Drilling Techniques, 2012, 40(6): 51-55. DOI: 10.3969/j.issn.1001-0890.2012.06.011
Citation: Cheng Zhong, Zhang Junbin, Liu Zhengli, Mou Xiaojun, Cheng Kun. Design and Application of Frac-Pack Completion String for Deep-Water Wells[J]. Petroleum Drilling Techniques, 2012, 40(6): 51-55. DOI: 10.3969/j.issn.1001-0890.2012.06.011

Design and Application of Frac-Pack Completion String for Deep-Water Wells

More Information
  • Received Date: May 20, 2012
  • Revised Date: October 11, 2012
  • In order to improve the recovery efficiency of deepwater oil and gas fields in China and reduce risk in deep-water completion,we developed and promoted the application of deep-water frac-pack completion.This paper gives a brief introduction of features of the technique and the design principles of the completion string,then presents the optimization of preparation and execution of deep-water completion according to the conditions and characteristics of deep-water wells.A complete set of techniques for lower section completion for deep water wells are formed including optimization of platform layout,completion fluid management,one trip wellbore cleaning,the joint operation of perforation and frac-pack,and precise operation,etc.This technology has been used in 8 wells in the eastern South China Sea deep-water cooperation blocks.With an average operating time of 12.53 d,it reached 100% success ratio in sand control.The data of well test shows that sand content and production of all the wells meets the requirement on commissioning.The technique fills the gap in deep-water well completion in eastern region of the South China Sea.Field application shows that the technique works well in sand control and production improvment,and can improve operation efficiency considerably.It is especially suited for fast and batch completion operations after drilling.
  • [1]
    陈彬,唐海雄,罗俊丰,等.西方大力神深水钻井平台国内首次应用介绍[J].海洋工程,2010,28(1):125-131. Chen Bin,Tang Haixiong,Luo Junfeng,et al. The first application of West Hercules in China[J].The Ocean Engineering,2010,28(1):125-131.
    [2]
    刘北羿. 压裂防砂技术进展及存在问题[J].油气地质与采收率,2008,15(4):105-107. Liu Beiyi.Technology progress and issues of fracturing sand control[J]. Petroleum Geology and Recovery Efficiency,2008,15(4):105-107.
    [3]
    海上油气田完井手册编委会. 海上油气田完井手册[M].北京:石油工业出版社,1998:294-320. Offshore Well Completion Editorial Committee.Offshore well completion[M].Beijing:Pestroleum Industry Press,1998:294-320.
    [4]
    万仁溥.现代完井工程[M].2版.北京:石油工业出版社,1996:49-53. Wan Renfu.Advanced well completion engineering[M].2nd ed.Beijing:Petroleum Industry Press,1996:49-53.
    [5]
    谢桂学.端部脱砂压裂技术初探[J].油气采收率技术,1996,3(1):54-58. Xie Guixue.Tip screenout fracturing technology[J]. Oil Gas Recovery Technology,1996,3(1):54-58.
  • Related Articles

    [1]SAIFULLA Dilmurat, DONG Changyin, LI Yanlong, CHEN Qiang, LIU Chenfeng, WANG Haoyu. Influence Law of Hybrid Plugging of Gravel-Packed Media on Productivityin Natural Gas Hydrate Reservoirs[J]. Petroleum Drilling Techniques, 2022, 50(5): 94-101. DOI: 10.11911/syztjs.2022055
    [2]ZHOU Hongyu, WAN Xiaojin, WU Shaowei, ZHANG Bin, KONG Yang. Study on the Sand Control Technique for Gravel Packing with Water Control for Horizontal Wells[J]. Petroleum Drilling Techniques, 2021, 49(1): 101-106. DOI: 10.11911/syztjs.2020138
    [3]DUAN Penghui, LEI Xiujie, LAI Angjie, ZHANG Tongwu, KANG Bo. Research and Application of Fixed-Plane Perforating and Fracturing Technologies in Ultra-Low Permeability Reservoirs[J]. Petroleum Drilling Techniques, 2019, 47(5): 104-109. DOI: 10.11911/syztjs.2019088
    [4]DUAN Youzhi, AI Shuang, LIU Huanle, YUE Hui. Shape Memory Screen Self-Packing Sand Control Completion Technology[J]. Petroleum Drilling Techniques, 2019, 47(5): 86-90. DOI: 10.11911/syztjs.2019106
    [5]ZHAO Xu, LONG Wu, YAO Zhiliang, PANG Wei. Completion Techniques Involving Gravel-Packing Inflow-Control Screens in Horizontal Wells[J]. Petroleum Drilling Techniques, 2017, 45(4): 65-70. DOI: 10.11911/syztjs.201704011
    [6]He Tao, Guo Jianchun, Lu Cong, Jing Yuquan. Optimization of Shut-in Time between the First and Second Fracturing by means of Pressure Decline Analysis[J]. Petroleum Drilling Techniques, 2015, 43(2): 110-115. DOI: 10.11911/syztjs.201502019
    [7]Liu Yu, Ai Chi. Opening of Natural Fractures under Induced Stress in Multi-Stage Fracturing[J]. Petroleum Drilling Techniques, 2015, 43(1): 20-26. DOI: 10.11911/syztjs.201501004
    [8]Han Zongzheng. Research and Application of Combined Perforation and Sand Control with Metal Plug[J]. Petroleum Drilling Techniques, 2013, 41(3): 119-122. DOI: 10.3969/j.issn.1001-0890.2013.03.023
    [9]Zeng Fanhui, Yin Jian, Guo Jianchun. Optimization of Perforation Orientation for Directional Well Fracturing[J]. Petroleum Drilling Techniques, 2012, 40(6): 74-78. DOI: 10.3969/j.issn.1001-0890.2012.06.016

Catalog

    Article Metrics

    Article views (3031) PDF downloads (3531) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return