ZHAO Xu, LONG Wu, YAO Zhiliang, PANG Wei. Completion Techniques Involving Gravel-Packing Inflow-Control Screens in Horizontal Wells[J]. Petroleum Drilling Techniques, 2017, 45(4): 65-70. DOI: 10.11911/syztjs.201704011
Citation: ZHAO Xu, LONG Wu, YAO Zhiliang, PANG Wei. Completion Techniques Involving Gravel-Packing Inflow-Control Screens in Horizontal Wells[J]. Petroleum Drilling Techniques, 2017, 45(4): 65-70. DOI: 10.11911/syztjs.201704011

Completion Techniques Involving Gravel-Packing Inflow-Control Screens in Horizontal Wells

More Information
  • Received Date: May 10, 2016
  • Revised Date: April 24, 2017
  • Conventional completion techniques involving inflow-control screen in horizontal wells are characterized by short packing intervals,limited packing intervals,difficulties in the installation of packers in deep wells and other technical challenges.Under such circumstances,research has been conducted to develop completion techniques involving gravel-packing inflow-control screens in horizontal wells.Based on studies related to technical principles and technical challenges in completion techniques involving gravel-packing inflow-control screens in horizontal wells,the advantages and drawbacks of screens of various types were reviewed.Subsequently,screens with choke nozzles or those with flowing channels were deployed.In consideration of requirements for completion involving grave-packing inflow-control screens in horizontal wells,polymer gravels with lower densities were used as packing gravels.Tests were conducted to assess the packing performances of gravels.Relevant results showed the gravel-packing layers could effectively eliminate horizontal flow of fluids in the borehole.Consequently,the layers might serve as packers.By highlighting gravel-packing techniques,completion techniques involving gravel-packing inflow-control screens in horizontal wells were developed.Field applications were performed in the horizontal Well A in the Tahe Oilfield.Compared with those before application,the the well productivity was enhanced by 411.8%,where as the water-cut was reduced by 13.5percent.Research results showed the completion techniques involving gravel-packing inflow-control screens in horizontal wells could effectively enhance the accuracy of the screen to stabilize oil production and to minimize the water cut. Such innovative technologies may be deployed more extensively to enhance production performances.
  • [1]
    TOR E,ALPAY E,GORDON G,等.向井流动控制装置:改善流动剖面[J].油田新技术,2009,21(4):30-37. TOR E,ALPAY E,GORDON G,et al.The well flow control device-to improve flow profile[J].Oilfield Review,2009,21(4):30-37.
    [2]
    徐鑫.水平井控流筛管完井技术研究及应用[J].石油钻探技术,2014,42(3):71-75. XU Xin.Development and application of flow control screen completion for horizontal wells[J].Petroleum Drilling Techniques,2014,42(3):71-75.
    [3]
    赵勇,杨海波,何苏荣.胜利低渗油田水平井筛管分段控流完井技术[J].石油钻探技术,2012,40(3):18-22. ZHAO Yong,YANG Haibo,HE Surong.Well completion technique with screen pipe controlling flow by segments in horizontal well of low permeability resevoirs in Shengli Oilfield[J].Petroleum Drilling Techniques,2012,40(3):18-22.
    [4]
    张国文,钱杰,刘凤,等.水平井控水完井管柱研究与应用[J].石油机械,2013,41(3):89-91. ZHANG Guowen,QIAN Jie,LIU Feng,et al.Research and application of the water control completion string for horizontal wells[J].China Petroleum Machinery,2013,41(3):89-91.
    [5]
    熊友明,刘理明,张林,等.我国水平井完井技术现状与发展建议[J].石油钻探技术,2012,40(1):1-6. XIONG Youming,LIU Liming,ZHANG Lin,et al.Present status and development comments on horizontal well completion techniques in China[J].Petroleum Drilling Techniques,2012,40(1):1-6.
    [6]
    OUYANG Liangbiao.Pratical consideration of an inflow-control device application for reducing water production[R].SPE 124154,2009.
    [7]
    AL ARFI S A,MOHAMED O Y,KESHKA A A,et al.Inflow control device an innovative completion solution from "extended wellbore to extended well life cycle"[R].SPE 119599,2009.
    [8]
    王金忠,肖国华,陈雷,等.水平井管内分段调流控水技术研究与应用[J].石油机械,2011,39(1):60-61,84. WANG Jinzhong,XIAO Guohua,CHEN Lei,et al.Research and application of the staged flow-regulating and water-control technology with screen or tubing in horizontal holes[J].China Petroleum Machinery,2011,39(1):60-61,84.
    [9]
    李良川,肖国华,王金忠,等.冀东油田水平井分段控水配套技术[J].断块油气田,2010,17(6):655-658. LI Liangchuan,XIAO Guohua,WANG Jinzhong,et al.Sectionalized water control matching technology of horizontal well in Jidong Oifield[J].Fault-Block Oil Gas Field,2010,17(6):655-658.
    [10]
    强晓光,姜增所,宋颖智.调流控水筛管在冀东油田水平井的应用研究[J].石油矿场机械,2011,40(4):77-79. QIANG Xiaoguang,JIANG Zengsuo,SONG Yingzhi.Research and application of water control screenpipe in Jidong Oilfield horizontal well[J].Oil Field Equipment,2011,40(4):77-79.
    [11]
    赵崇镇.水平井自适应调流控水装置研制与应用[J].石油钻探技术,2016,44(3):95-100. ZHAO Chongzhen.Development and application of an autonomous inflow control device in horizontal wells[J].Petroleum Drilling Techniques,2016,44(3):95-100.
    [12]
    刘均荣,于伟强.ICD/ICV井下流量控制技术[J].石油矿场机械,2013,42(3):1-6. LIU Junrong,YU Weiqiang.Downhole inflow control technology with ICD/ICV[J].Oil Field Equipment,2013,42(3):1-6.
    [13]
    王庆,刘慧卿,张红玲,等.油藏耦合水平井调流控水筛管优选模型[J].石油学报,2011,32(2):346-349. WANG Qing,LIU Huiqing,ZHANG Hongling,et al.An optimization model of completion strings with inner-located nozzle in horizontal wells coupled with reservoirs[J].Acta Petrolei Sinica,2011,32(2):346-349.
    [14]
    赵旭,姚志良,刘欢乐.水平井调流控水筛管完井设计方法研究[J].石油钻采工艺,2013,35(1):23-27. ZHAO Xu,YAO Zhiliang,LIU Huanle.Technical research on well completion design with inflow control device (ICD) in horizontal wells[J].Oil Drilling Production Technology,2013,35(1):23-27.
    [15]
    王超,张军杰,刘广燕.水平井分段控水完井试油技术[J].石油天然气学报,2010,32(6):446-449. WANG Chao,ZHANG Junjie,LIU Guangyan.The horizontal well section control water completion oil test technology[J].Journal of Oil and Gas Technology,2010,32(6):446-449.
    [16]
    郑永哲,杨士明,于学良,等.大港滩海赵东区块水平井裸眼砾石充填防砂完井技术[J].石油钻探技术,2009,37(4):88-92. ZHENG Yongzhe,YANG Shiming,YU Xueliang,et al.Horizontal well open hole gravel packing sand control completion technique used in Zhaodong Block,Dagang Offshore[J].Petroleum Drilling Techniques,2009,37(4):88-92.
    [17]
    王登庆.水平井砾石充填防砂工艺技术研究[D].东营:中国石油大学(华东)石油工程学院,2008. Wang Dengqing.Research on gravel packing sand control for horizontal well[D].Dongying:China University of Petroleum(Huadong),School of Petroleum Engineering,2008.
  • Related Articles

    [1]LI Ran, LI Wenzhe, ZHANG Jiayin, LIU Yang. Drilling Fluid Technology for Ultra-Large Wellbore in the Upper Part of 10 000-Meter Deep Well SDCK1[J]. Petroleum Drilling Techniques, 2024, 52(2): 93-99. DOI: 10.11911/syztjs.2024040
    [2]LI Wandong, WU Yang, LAN Xiaolin. Cementing Technologies of Balanced Off-Bottom Cement Plugs in Eastern Ecuador[J]. Petroleum Drilling Techniques, 2022, 50(4): 83-89. DOI: 10.11911/syztjs.2022032
    [3]CAO Hui, LI Baojun, ZHAO Xiangyang. Drilling Fluid Technology for Horizontal Wells in Ecuador Tambococha Oilfield[J]. Petroleum Drilling Techniques, 2022, 50(1): 54-59. DOI: 10.11911/syztjs.2021104
    [4]WANG Zhiyuan, HUANG Weian, FAN Yu, LI Xiaojie, WANG Xudong, HUANG Shengming. Technical Research and Application of Oil Base Drilling Fluid with Strong Plugging Property in Changning Block[J]. Petroleum Drilling Techniques, 2021, 49(5): 31-38. DOI: 10.11911/syztjs.2021039
    [5]LI Wandong. Cementing Technology Applied in the Parahuacu Oilfield of Ecuador[J]. Petroleum Drilling Techniques, 2021, 49(1): 74-80. DOI: 10.11911/syztjs.2020109
    [6]YU Lei, ZHANG Jinghui, LI Gongrang, ZHAO Huaizhen, LIU Tianke. Research and Application of Plugging Drilling Fluid with Low-Activity and High Inhibition Properties[J]. Petroleum Drilling Techniques, 2018, 46(1): 44-48. DOI: 10.11911/syztjs.2018031
    [7]SHI Bingzhong, XIE Chao, LI Sheng, LIU Jinhua, CHEN Xiaofei. Development and Application of Drilling Fluid in the Jin-58 Well Block of the Hangjinqi Block[J]. Petroleum Drilling Techniques, 2017, 45(6): 37-41. DOI: 10.11911/syztjs.201706007
    [8]LIU Wentang, GUO Jianhua, LI Wuchen, JU Liuzhu, LI Bin. The Development and Application of a Microsphere Gel Composite Plugging Agents[J]. Petroleum Drilling Techniques, 2016, 44(2): 34-39. DOI: 10.11911/syztjs.201602006
    [9]Zhang Guilin. Key Drilling Technologies in the Block B at the Right Bank of Amu Darya, Turkmenistan[J]. Petroleum Drilling Techniques, 2015, 43(6): 1-6. DOI: 10.11911/syztjs.201506001
    [10]Yang Li. Leak Prevention and Plugging Techniques for Shale Gas Horizontal Wells in Pengshui Block[J]. Petroleum Drilling Techniques, 2013, 41(5): 16-20. DOI: 10.3969/j.issn.1001-0890.2013.05.003
  • Cited by

    Periodical cited type(4)

    1. 曹辉,李宝军,赵向阳. 厄瓜多尔Tambococha油田水平井钻井液技术. 石油钻探技术. 2022(01): 54-59 . 本站查看
    2. 袁青松,冯辉,张栋,李中明,代磊,董果果. 强封堵钻井液体系在河南页岩气钻井中的研究和应用. 钻井液与完井液. 2019(01): 29-35 .
    3. 叶成,戎克生,向冬梅,闫鹏,蒲晓林,罗霄. 泥页岩胺类抑制剂PEDAS的研制与性能评价. 断块油气田. 2017(02): 269-272+288 .
    4. 韩子轩,林永学,柴龙,李大奇. 裂缝性气藏封缝堵气技术研究. 钻井液与完井液. 2017(01): 16-22 .

    Other cited types(0)

Catalog

    Article Metrics

    Article views (8109) PDF downloads (6819) Cited by(4)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return