Citation: | Han Zongzheng. Research and Application of Combined Perforation and Sand Control with Metal Plug[J]. Petroleum Drilling Techniques, 2013, 41(3): 119-122. DOI: 10.3969/j.issn.1001-0890.2013.03.023 |
[1] |
吴志勇.辽河油区油井射孔防砂技术及发展方向探讨[J].石油矿场机械,2011,40(1):32-37. Wu Zhiyong.Discussion on oil well perforation and sand control and tendency in Liaohe Oil Zone[J].Oil Field Equipment,2011,40(1):32-37.
|
[2] |
刘呈君,李宾元,李怀文.射孔防砂技术研究[J].钻采工艺,2006,29(2):37-38. Liu Chengjun,Li Binyuan,Li Huaiwen.Research on perforation sand control technology[J].Drilling Production Technology,2006,29(2):37-38.
|
[3] |
杨胜来,蒋利平,刘长喜,等.射孔-防砂联作防砂效果室内模拟与测试[J].油气井测试,2005,14(2):64-66. Yang Shenglai,Jiang Liping,Liu Changxi,et al.Surface simulation and sand proof effect test on composite perforation sand control technique[J].Well Testing,2005,14(2):64-66.
|
[4] |
王志伟,史军,杨再新,等.复合射孔技术在低渗透油藏的应用[J].西部探矿工程,2005,17(5):62-64. Wang Zhiwei,Shi Jun,Yang Zaixin,et al.Application of combined perforating technique in low permeability reservoir[J].West-China Exploration Engineering,2005,17(5):62-64.
|
[5] |
王艳萍,黄寅生,潘永新,等.复合射孔技术的现状与趋势[J].爆破器材,2002,31(3):30-34. Wang Yanping,Huang Yinsheng,Pan Yongxin,et al.Situation and trendency of combined perforating-fracturing techniques[J].Explosive Materials,2002,31(3):30-34.
|
[6] |
史慧生,孙厚利.油井用射孔和孔道防砂技术[J].爆破器材,2004,33(2):33-36. Shi Huisheng,Sun Hongli.A technique of combined perforating with hole sand-control for oil well[J].Explosive Materials,2004,33(2):33-36.
|
[7] |
朱君,冯子明,王春许.新型防砂射孔设计方案[J].油气井测试,2004,13(1):62-63. Zhu Jun,Feng Ziming,Wang Chunxu .Plan of a new sand-preventive perforating charge[J].Well Testing,2004,13(1):62-63.
|
[8] |
范学君.油管输送射孔抽油泵联作技术研究与应用[J].测井技术,2003,27(1):66-69. Fan Xuejun.On joint operation of TCP and oil-pump-running and its applications[J].Well Logging Technology,2003,27(1):66-69.
|
[9] |
逯启高.测试-射孔联作管柱优化[J].油气井测试,2007,16(1):50-51. Lu Qigao.Optimization of combined operation string of perforation and testing[J].Well Testing,2007,16(1):50-51.
|
[10] |
陶亮,虞青俊,李玉龙,等.复合射孔数值模拟精度的实验验证[J].石油机械,2007,35(2):5-8. Tao Liang,Yu Qingjun,Li Yulong,et al.Experimental verification of numerical analysis accuracy of composite perforation[J].Petroleum Machinery,2007,35(2):5-8.
|
[11] |
陶亮,艾晓莉.复合射孔数值模拟的准确性验证及其应用展望[J].测井技术,2007,31(1):45-49. Tao Liang,Ai Xiaoli.The accuracy verification on numerical simulation of perforation and its applying prospect[J].Well Logging Technology,2007,31(1):45-49.
|
[12] |
赵开良,吴永清,魏永刚.复合射孔器效能监测、对比分析及优化[J].测井技术,2007,31(1):66-71. Zhao Kailiang,Wu Yongqing,Wei Yonggang.Effect monitoring,correlating and optimizing of composite perforator[J].Well Logging Technology,2007,31(1):66-71.
|
[13] |
刁刚田,刘志华,周家驹,等.复合射孔技术的应用[J].钻采工艺,2003,26(6):29-33. Diao Gangtian,Liu Zhihua,Zhou Jiaju,et al.The application of compound perforation technology[J].Drilling Production Technology,2003,26(6):29-33.
|
[14] |
郑志雄,毛志刚,李峰华,等.复合射孔技术的推广应用[J].油气井测试,2006,12(3):34-35. Zheng Zhixiong,Mao Zhigang,Li Fenghua,et al.The extend and its application of compound perforate technology[J].Well Testing,2006,12(3):34-35.
|
[15] |
袁吉诚.中国射孔技术的现状与发展[J].测井技术,2002,26(5):421-425. Yuan Jicheng.On the development of perforating technology in China[J].Well Logging Technology,2002,26(5):421-425.
|
[1] | HU Zubiao, ZHANG Jianqing, WANG Qingchen, WU Fuping, HAN Chengfu, LIU Weirong. Drilling Fluid Technology for Ultra-Long Horizontal Section of Well Hua H50-7 in the Changqing Oilfield[J]. Petroleum Drilling Techniques, 2020, 48(4): 28-36. DOI: 10.11911/syztjs.2020050 |
[2] | SHI Bingzhong, XIE Chao, LI Sheng, LIU Jinhua, CHEN Xiaofei. Development and Application of Drilling Fluid in the Jin-58 Well Block of the Hangjinqi Block[J]. Petroleum Drilling Techniques, 2017, 45(6): 37-41. DOI: 10.11911/syztjs.201706007 |
[3] | ZHANG Yaming, GAO Zhentao, LI Jun, YANG Jing, ZHANG Yi, ZHANG Yanru. The Deep and Slim Casing Milling Technology of Well SU7 in Suqiao Gas Storage[J]. Petroleum Drilling Techniques, 2017, 45(3): 38-41. DOI: 10.11911/syztjs.201703007 |
[4] | Liu Zhiying, Wang Zhiyao, Dong Yongjun, Wang Shuhua, Gao Wentao. The Technology of Integrated Layered Perforation and Formation Testing in One Trip[J]. Petroleum Drilling Techniques, 2014, 42(2): 97-101. DOI: 10.3969/j.issn.1001-0890.2014.02.019 |
[5] | Cheng Zhong, Zhang Junbin, Liu Zhengli, Mou Xiaojun, Cheng Kun. Design and Application of Frac-Pack Completion String for Deep-Water Wells[J]. Petroleum Drilling Techniques, 2012, 40(6): 51-55. DOI: 10.3969/j.issn.1001-0890.2012.06.011 |
[6] | Yang Xiaofeng. Application of High Temperature Resisting sureshot-MWD in Xinggu 7 Block[J]. Petroleum Drilling Techniques, 2012, 40(1): 119-122. DOI: 10.3969/j.issn.1001-0890.2012.01.024 |
[7] | Wang Haijing, Xue Shifeng, Tong Xinghua. Analysis of Factors Influencing the Production Profile Equilibrium for Perforated Horizontal Wells[J]. Petroleum Drilling Techniques, 2012, 40(1): 78-82. DOI: 10.3969/j.issn.1001-0890.2012.01.016 |