GUO Zhaohui. Key Technology of Drilling Liner Hanger and Tieback Device in Staged Fracturing[J]. Petroleum Drilling Techniques, 2018, 46(2): 44-49. DOI: 10.11911/syztjs.2018043
Citation: GUO Zhaohui. Key Technology of Drilling Liner Hanger and Tieback Device in Staged Fracturing[J]. Petroleum Drilling Techniques, 2018, 46(2): 44-49. DOI: 10.11911/syztjs.2018043

Key Technology of Drilling Liner Hanger and Tieback Device in Staged Fracturing

More Information
  • Received Date: August 06, 2017
  • In order to solve the problems of high cost,poor conditions,and frac interference,in tight oil and gas and shale gas,a new technique for controlling the liner tieback string for staged fracturing was studied and developed.Based on the analysis and research on the contradiction between cementing leakage and high fracturing pressure of the reservoir,the rapid full-size fracturing was proposed after liner cementing.Through the study on the optimized combination mode of cementing and completing technologies,this paper put forward one segmental fracturing reservoir reconstruction technique which identified zones of preferential enrichment (sweet spots) with fixed-point perforation after the liner cementing in horizontal wells.By means of optimizing the design of the liner cementing and the tie back fracturing tools,the integrated sealing anchor of the cementing and completing tools was realized.The test results proved that the sealing ability of the liner hanger and tie back stinger was up to 90 MPa,and the tensile strength between the tie back stinger and the liner hanger was 1 800 kN,and the tie back stinger was released successfully.In addition,this technology was applied in more than 27 wells,including the Daniudi Gas Field,Dongsheng Gas Field and Longdong Block of the Changqing Oilfield.Although the operation pressures in these applications were high,all fracturing operations were finished successfully,with good application effects being achieved.Research results showed that the new technology of liner tieback string for staged fracturing could solve the problems of the high pressure and jacking force required for fracturing operations,and it could provide a high pressure,large drift diameter,retrievable and anchored wellbore for a segmented fracturing technique after tie back cementing,thus having the effect of protecting the reservoir drive.
  • [1]
    陈作,曾义金.深层页岩气分段压裂技术现状及发展建议[J].石油钻探技术,2016,44(1):6-11. CHEN Zuo,ZENG Yijin.Present situations and prospects of multi-stage fracturing technology for deep shale gas development[J].Petroleum Drilling Techniques,2016,44(1):6-11.
    [2]
    张永春,狄伟,何青,等.水平井分段酸压工艺在大牛地气田的研究与应用[J].石油天然气学报,2013,35(9):109-112. ZHANG Yongchun,DI Wei,HE Qing,et al.The application and research of sectional acidic fracturing technology in horizontal wells of Daniudi Gasfield[J].Journal of Oil and Gas Technology,2013,35(9):109-112.
    [3]
    韩峰,王建全,薛占峰,等.致密油气藏水平井全通径压裂技术[J].中国海洋平台,2017,32(3):12-17. HAN Feng,WANG Jianquan,XUE Zhanfeng,et al.Multi-stage full-bore fracturing technology for horizontal well in tight reservoirs[J].China Offshore Platform,2017,32(3):12-17.
    [4]
    马开华.关于国内尾管悬挂器技术发展问题的思考[J].石油钻采工艺,2008,30(6):108-112. MA Kaihua.A consideration on the development of liner hanger technologies in China[J].Oil Drilling Production Technology,2008,30(6):108-112.
    [5]
    付玉坤,喻成刚,尹强,等.国内外页岩气水平井分段压裂工具发展现状与趋势[J].石油钻采工艺,2017,39(4):514-520. FU Yukun,YU Chenggang,YIN Qiang,et al.Development status and trend of shale-gas horizontal well staged fracturing tools at home and abroad[J].Oil Drilling Production Technology,2017,39(4):514-520.
    [6]
    张国安,姚辉前,李维斌,等.水平井尾管回接分段压裂技术的应用[J].石油机械,2015, 43(9):105-108. ZHANG Guoan,YAO Huiqian,LI Weibin,et al.Application of horizontal well liner tie back and staged fracturing technology[J].China Petroleum Machinery,2015,43(9):105-108.
    [7]
    郑晓志,谷磊,马兰荣,等.可旋转膨胀尾管悬挂器性能研究及现场试验[J].石油钻探技术,2016,44(3):55-60. ZHENG Xiaozhi,GU Lei,MA Lanrong,et al.Performance and field tests of rotary expandable liner hanger[J].Petroleum Drilling Techniques,2016,44(3):55-60.
    [8]
    阮臣良,李富平,李风雷,等.尾管悬挂器超高压封隔及回接技术应用研究[J].长江大学学报(自科版),2016,13(19):42-45. RUAN Chenliang,LI Fuping,LI Fenglei,et al.Application of ultra-high pressure ZXP packer and tie-back technology[J].Journal of Yangtze University(Natural Science Edition),2016,13(19):42-45.
    [9]
    谭奇,张明华,高剑玮,等.川西水平井尾管悬挂及回接固井技术[J].天然气与石油,2015,33(5):59-61,69. TAN Qi,ZHANG Minghua,GAO Jianwei,et al.Horizontal well liner hanging and tie-back cementing technology in Western Sichuan[J].Natural Gas and Oil,2015,33(5):59-61,69.
    [10]
    李润,龙远盛,尹红斌.水平井尾管固井技术及其在苏里格气田的应用[J].天然气工业,2012,32(4):66-68. LI Run,LONG Yuansheng,YIN Hongbin.Liner cementing in horizontal wells and its field pracitices in the Sulige Gas Field[J].Natural Gas Industry,2012,32(4):66-68.
    [11]
    朱和明,薛占峰,赵聪,等.分段压裂专用悬挂器关键技术研究与应用[J].石油机械,2013,41(5):79-84. ZHU Heming,XUE Zhanfeng,ZHAO Cong,et al.Research and application of key technology of special hanger for staged fracture[J].China Petroleum Machinery,2013,41(5):79-84.
  • Related Articles

    [1]LI Shuzhan, YANG Jin, ZHU Guojing, LI Zhong, WANG Ning. Prediction of the Minimum Depth of Setting for Conductor Anchor Node in Deep-Water Drilling[J]. Petroleum Drilling Techniques, 2023, 51(2): 29-36. DOI: 10.11911/syztjs.2022039
    [2]LIANG Wenlong, XUE Zhanfeng, MA Lanrong. Key Technologies for a Detachable Bi-Directional Anchoring Suspension Packer[J]. Petroleum Drilling Techniques, 2019, 47(4): 59-63. DOI: 10.11911/syztjs.2019017
    [3]XU Jianning, ZHENG Shunze, LI Zhongwen, XI Wenkui, WEI Yaming, YANG Xudong. Performance Analysis and Optimization of the Anchor Mechanism of Coupling Anchor Type Downhole Throttle[J]. Petroleum Drilling Techniques, 2018, 46(2): 103-108. DOI: 10.11911/syztjs.2018053
    [4]Zhao Lei. Cable Conveying and Releasing Logging Meter in Complicated Horizontal Wells in Western Sichuan[J]. Petroleum Drilling Techniques, 2015, 43(6): 66-69. DOI: 10.11911/syztjs.201506012
    [5]Zhao Suwen, Huang Xiaolong, Xiong Aijiang, Sun Zigang, Zhao Weiqing. Key Technologies of the Subsea Release Cementing Process[J]. Petroleum Drilling Techniques, 2015, 43(6): 54-58. DOI: 10.11911/syztjs.201506010
    [6]Ni Xiaoming, Hu Haiyang, Cao Yunxing, Pang Donglin, Guo Zhiqi. The Determination of Casing Releasing Pressure of CBM Wells and Its Application[J]. Petroleum Drilling Techniques, 2015, 43(4): 113-117. DOI: 10.11911/syztjs.201504020
    [7]Wang Jianquan, Liu Guoxiang, Wang Hong, Li Jianye, Li Wensheng, Zhou Xiaofei. Critical Tieback Equipment Techniques for Preventing Gas Channeling during Liner Cementing in Ultrahigh Pressure Wells[J]. Petroleum Drilling Techniques, 2015, 43(3): 125-129. DOI: 10.11911/syztjs.201503023
    [8]Wu Junxia, Huang Jianlin, Yue Hui, He Hanping, Fu Daoming. The Technology for Releasing Packers by means of Formation Pressure in Well S22[J]. Petroleum Drilling Techniques, 2014, 42(6): 59-63. DOI: 10.11911/syztjs.201406012
    [9]Zhang Guilin. Handle Position of the Three-Position Four-Way Directional Control Valve on the Remote Control Console of BOP[J]. Petroleum Drilling Techniques, 2014, 42(6): 8-12. DOI: 10.11911/syztjs.201406002
    [10]Hu Fengjin. Discussion on the Handle Position of Three Position Four Way Steering Valve on Remote Control Console of Well Control Equipment[J]. Petroleum Drilling Techniques, 2014, 42(3): 8-12. DOI: 10.3969/j.issn.1001-0890.2014.03.002
  • Cited by

    Periodical cited type(8)

    1. 李彦操,周建民,周晓轩,刘霞继,杨倩云,邱春阳. 车斜577井深部地层防塌钻井液技术难点分析与研究. 四川化工. 2024(03): 24-27 .
    2. 李秀灵,赵怀珍,蓝强,李琼. 抗高温低固相钻井液在桩古斜411井的应用. 承德石油高等专科学校学报. 2023(02): 46-52 .
    3. 曾佳,程慧君. 无固相钻井液技术现状及发展趋势. 辽宁化工. 2022(03): 388-390+441 .
    4. 刘瑞,于培志. 抗高温水基钻井液处理剂研究进展. 应用化工. 2021(06): 1618-1621 .
    5. 徐明磊,佟乐,杨双春,张同金,ELAMAN,刘阳. 环保型耐高温无固相钻井液体系研究进展. 应用化工. 2020(08): 2063-2067+2074 .
    6. 卢兴国. 新型疏水缔合聚合物钻井液体系性能评价. 化学与生物工程. 2020(10): 47-50 .
    7. 耿学礼,苏延辉,郑晓斌,高波. 无固相保护煤层钻井液研究及应用. 石油钻采工艺. 2017(04): 455-459 .
    8. 张群正,刘金磊,孙淑娟,周慧鑫,杨萌,白永强. 控流管路中降滤失剂的合成与性能研究. 钻井液与完井液. 2017(03): 39-43 .

    Other cited types(1)

Catalog

    Article Metrics

    Article views (1893) PDF downloads (1942) Cited by(9)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return