Zhang Lei, Chang Yuanjiang, Liu Xiuquan, Liu Kang, Chen Liming. Recoil Analysis for Deepwater Drilling Riser after Emergency Disconnection with Blowout Preventer[J]. Petroleum Drilling Techniques, 2013, 41(3): 25-30. DOI: 10.3969/j.issn.1001-0890.2013.03.005
Citation: Zhang Lei, Chang Yuanjiang, Liu Xiuquan, Liu Kang, Chen Liming. Recoil Analysis for Deepwater Drilling Riser after Emergency Disconnection with Blowout Preventer[J]. Petroleum Drilling Techniques, 2013, 41(3): 25-30. DOI: 10.3969/j.issn.1001-0890.2013.03.005

Recoil Analysis for Deepwater Drilling Riser after Emergency Disconnection with Blowout Preventer

More Information
  • Received Date: February 28, 2013
  • Revised Date: May 01, 2013
  • During deepwater drilling process,recoil behavior of drilling riser will occur once the lower marine riser package is quickly disconnected from the blowout preventer,which could lead to serious drilling accidents.In order to understand riser recoil behavior,the reason for riser recoil and the recoil process were analylzed,and the main factors that influence riser recoil response were determined.Based on these studies,the analysis model of the tensioner system was built to investigate the relationship between tension force and piston stroke.Drilling fluid flow model was built to work out the relationship between friction force imparted by drilling fluid on riser and time.Finally,the modeling method for main influence factors in finite element software was studied,and the recoil analysis model was built in ANSYS software.Taking the riser in 1 500 m deep water drilling as an example,riser recoil response at different points of disconnection and top tension forces were calculated and analyzed.The results showed that the riser recoiled upward quickly after being disconnected from blowout preventer under the effect of top tension,resulting in significant shortening of telescopic joint stroke.The riser recoil response was heavily dependent on the point of disconnection and top tension force.Proper timing of disconnection and top tension force could result in a sensible riser recoil response,ensuring operation safety of deepwater drilling riser.
  • [1]
    Young R D,Hock C J,Karlsen G,et al.Analysis and design of anti-recoil system for emergency disconnect of a deepwater riser:case study.OTC 6891,1992.
    [2]
    Sten R,Hansen M R,Larsen C M,et al.Force variations on heave compensating system for ultra-deepwater drilling risers:the 29th International Conference on Ocean,Offshore and Arctic Engineering,Shanghai,June 6-11,2010.
    [3]
    Lang D W,Real J,Lane M.Recent developments in drilling riser disconnect and recoil analysis for deepwater applications:the 28th International Conference on Ocean,Offshore and Arctic Engineering,May 31-June 5,2009.
    [4]
    Shaughnessy J M,Armageost W K,Herrmann R P,et al.Problems of ultra-deepwater drilling.SPE/IADC 52782,1999.
    [5]
    James N B.Key elements in ultra-deep water drilling riser management.SPE/IADC 67812,2001.
    [6]
    鞠少栋,畅元江,陈国明,等.超深水钻井作业隔水管顶张力确定方法[J].海洋工程,2011,29(1):100-104. Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Determination methods for the top tension of ultradeepwater drilling risers[J].The Ocean Engineering,2011,29(1):100-104.
    [7]
    Hock C J,Young R D.A deepwater riser emergency disconnect anti-recoil system.OTC 23858,1993.
    [8]
    Grytoyr G.Marine drilling riser disconnect and recoil analysis.AADE-11-NTCE-80,2011.
    [9]
    赵建亭,薛颖,潘云,等.浮式钻井装置隔水管张紧系统研究[J].上海造船,2010(4):1-5. Zhao Jianting,Xue Ying,Pan Yun,et al.Study on riser tensioning system of floating drilling unit[J].Shanghai Shipbuilding,2010 (4):1-5.
    [10]
    Servet Haziri.Development of simulation model for virtual testing and design of a riser tensioner system.Kristiansand:University of Agder,Department of Engineering,2011.
    [11]
    Puccio W F,Nuttall R V.Riser recoil during unscheduled lower marine riser package disconnects.SPE/IADC 39296,1998.
    [12]
    杨筱蘅.输油管道设计与管理[M].东营:中国石油大学出版社,2006:88-97. Yang Xiaoheng.Design and management of oil pipeline[M].Dongying:China University of Petroleum Press,2006:88-97.
  • Related Articles

    [1]CAO Hui, LI Baojun, ZHAO Xiangyang. Drilling Fluid Technology for Horizontal Wells in Ecuador Tambococha Oilfield[J]. Petroleum Drilling Techniques, 2022, 50(1): 54-59. DOI: 10.11911/syztjs.2021104
    [2]LI Xiong, LIU Guichuan. An Optimization Method for Bentonite Used for Drilling Fluid Based on Characteristic Diamond Diagram[J]. Petroleum Drilling Techniques, 2018, 46(4): 59-64. DOI: 10.11911/syztjs.2018108
    [3]SHI Bingzhong, XIE Chao, LI Sheng, LIU Jinhua, CHEN Xiaofei. Development and Application of Drilling Fluid in the Jin-58 Well Block of the Hangjinqi Block[J]. Petroleum Drilling Techniques, 2017, 45(6): 37-41. DOI: 10.11911/syztjs.201706007
    [4]LIU Xiuquan, LI Jiayi, REN Keren, XU Liangbin, CHANG Yuanjiang, SONG Qiang. A Calculation Method for the Top Tension of Deepwater Drilling Risers Based on Recoil Response[J]. Petroleum Drilling Techniques, 2016, 44(4): 47-51. DOI: 10.11911/syztjs.201604009
    [5]Zhang Zhicai, Zhao Huaizhen, Ci Guoliang, Li Jun, Ji Yibing. Drilling Fluid in Zhuang 129-1HF Extended Reach Well Drilling[J]. Petroleum Drilling Techniques, 2014, 42(6): 34-39. DOI: 10.11911/syztjs.201406007
    [6]Zhang Hao, Zhang Bin, Xu Guojin. Applications of Zwitterionic Polymer HRH Drilling Fluid in Linpan Oilfield[J]. Petroleum Drilling Techniques, 2014, 42(2): 57-63. DOI: 10.3969/j.issn.1001-0890.2014.02.012
    [7]Ren Liwei, Xia Bairu, Tang Wenquan, Song Zhaohui. Drilling Fluid Technology for Deep Troublesome Formation of Y Oilfield in Iran[J]. Petroleum Drilling Techniques, 2013, 41(4): 92-96. DOI: 10.3969/j.issn.1001-0890.2013.04.020
    [8]Li Daqi, Kang Yili, Liu Xiushan, Chen Zengwei, Si Na. Progress in Drilling Fluid Loss Dynamics Model for Fractured Formations[J]. Petroleum Drilling Techniques, 2013, 41(4): 42-47. DOI: 10.3969/j.issn.1001-0890.2013.04.010
    [9]Zhang Zuoqing, Dou Jintao, Fu Jianguo, Pu Jie, Wu Yingzhang. Drilling Fluid Research for Paleogene Strata in Yingmaili Area[J]. Petroleum Drilling Techniques, 2013, 41(2): 54-58. DOI: 10.3969/j.issn.1001-0890.2013.02.011
    [10]Peng Shengyu, Geng Tie, Chen Zhonghua, Sun Qiang, Duan Lianchao. Drilling Fluid for Tuff Formation in Block C2 of Myanmar[J]. Petroleum Drilling Techniques, 2012, 40(6): 115-118. DOI: 10.3969/j.issn.1001-0890.2012.06.024

Catalog

    Article Metrics

    Article views (3366) PDF downloads (3813) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return