Hydrajet Fracturing Technology of U-Shape Coal Bed Methane Wells

More Information
  • Received Date: September 17, 2012
  • Revised Date: February 15, 2013
  • In hydrajet fracturing on U-shape coal bed methane (CBM) well,the abrasive perforating sand is difficult to return to the ground and may cause sand sticking.To solve this problem,design of the tool was modified on the basis of horizontal well hydrajet fracturing techniques.First,the centralizer channel was changed from direct to spiral and the nozzle was changed from built-up ceramic to monolithic alloy.Second,operation process was modified,in which both the perforation sand and flowback fluid return to the ground from the vertical well.Finally,the optimized nozzle diameter of 6 mm and optimum tubing displacement of 2.0 m3/min were determined.Field test showed that the modified tools and techniques could effectively avoid sand sticking.4 stage fracturing treatments were finished in the well successfully by using the optimized parameters,with slick water injection of 1 932 m3,sand of 90 m3,and the highest sand ratio reached 23%.After dewatering and depressurization for 3 months,the well started to produce with stable production of 500 m3 per day and the accumulated gas of about 75 000 m3.With the modified tools,techniques and optimized parameters,the problem in the U-shape CBM well fracturing had been addressed and it would provide a reference for subsequent U-shape CBM well fracturing.
  • [1]
    Surjaatmadja J B,Grundmann S R,McDaniel B,et al.Hydrajet fracturing:an effective method for placing many fractures in openhole horizontal wells[R].SPE 48856,1998.
    [2]
    潘建华.水力喷射压裂技术在筛管完井水平井上的应用[J].石油地质与工程,2010,24(3):104-105. Pan Jianhua.Application of water-jet fracturing on horizontal wells with screen completion[J].Petroleum Geology and Engineering,2010,24(3):104-105.
    [3]
    田守嶒,李根生,黄中伟,等.水力喷射压裂机理与技术研究进展[J].石油钻采工艺,2008,30(1):58-62. Tian Shouzeng,Li Gensheng,Huang Zhongwei,et al.Research on hydrajet fracturing mechanisms and technologies[J].Oil Drilling Production Technology,2008,30(1):58-62.
    [4]
    夏强,黄中伟,李根生,等.水力喷射孔内射流增压规律试验研究[J].流体机械,2009,37(2):1-5. Xia Qiang,Huang Zhongwei,Li Gensheng,et al.Experimental study on the law of jetting boost pressure in hydrajetting[J].Fluid Machinery,2009,37(2):1-5.
    [5]
    范薇,胥云,王振铎,等.井下水力喷砂压裂工具典型结构及应用[J].石油钻探技术,2009,37(6):7-10. Fan Wei,Xu Yun,Wang Zhenduo,et al.Typical structure and application of downhole sand jet fracturing tools[J].Petroleum Drilling Techniques,2009,37(6):7-10.
    [6]
    李根生,夏强,黄中伟,等.深井水力喷射压裂可行性分析及计算[J].石油钻探技术,2011,39(5):58-62. Li Gengsheng,Xia Qiang,Huang Zhongwei,et al.Feasibility study and treatment design of hydrojet-fracturing in deep wells[J].Petroleum Drilling Techniques,2011,39(5):58-62.
    [7]
    盛茂,李根生,黄中伟,等.水力喷射孔内射流增压规律数值模拟研究[J].钻采工艺,2011,34(2):42-45. Sheng Mao,Li Gensheng,Huang Zhongwei,et al.Numerical simulation of pressure boosting effect in jet hole during hydra-jet fracturing[J].Drilling Production Technology,2011,34(2):42-45.
    [8]
    曲海,李根生,黄中伟,等.水力喷射压裂孔道内部增压机制[J].中国石油大学学报:自然科学版,2010,34(5):73-76. Qu Hai,Li Gensheng,Huang Zhongwei,et al.Boosting mechanism in hydrajet-fracturing cavity[J].Journal of China University of Petroleum:Edition of Natural Science,2010,34(5):73-76.
    [9]
    曲海,李根生,黄中伟,等.水力喷射分段压裂密封机理[J].石油学报,2011,32(3):514-517. Qu Hai,Li Gensheng,Huang Zhongwei,et al,Sealing mechanism of the hydra-jet stepwise fracturing[J].Acta Petrolei Sinica,2011,32(3):514-517.
    [10]
    Surjaatmadja J B,McDaniel B W,Clint B,et al.Effective stimulation of multilateral completions in the james lime formation achieved by controlled individual placement of numerous hydraulic fractures[R].SPE 82212,2003.
    [11]
    Hill E,Zhao Z,Terry A.Sand jet perforating and annular coiled tubing fracturing provides effective horizontal well stimulation[R].SPE 135591,2010.
    [12]
    曲海,李根生,刘营,等.拖动式水力喷射分段压裂工艺在筛管水平井完井中的应用[J].石油钻探技术,2012,40(3):83-86. Qu Hai,Li Gensheng,Liu Ying,et al.The application of dragged multistage hydrojet-fracturing in horizontal well with screen pipe completion[J].Petroleum Drilling Techniques,2012,40(3):83-86.
    [13]
    张义,鲍清英,孙粉锦,等.煤层气U型井钻完井新技术研究[G]//叶建平,傅小康,李五忠.2011年煤层气学术研讨会论文集:中国煤层气技术进展.北京:地质出版社,2011:263-270. Zhang Yi,Bao Qingying,Sun Fenjin,et al.Study on drilling and completion technologies for coalbed methane U-shaped wells[G]//Ye Jianping,Fu Xiaokang,Li Wuzhong.2011 coalbed methane symposium:Chinese CBM technology progress.Beijing:Geological Publishing House,2011:263-270.
    [14]
    张洪,何爱国,杨风斌,等.U型井开发煤层气适应性研究[J].中外能源,2011,16(12):33-36. Zhang Hong,He Aiguo,Yang Fengbin,et al.Study on the adaptability of the U-shape wells on developing the coalbed methane[J].Sino-Global Energy,2011,16(12):33-36.
    [15]
    杜发勇,张恩仑,张学政,等.压裂施工中管路摩阻计算方法分析与改进意见探讨[J].钻采工艺,2002,25(5):41-43. Du Fayong,Zhang Enlun,Zhang Xuezheng,et al.The analysis and improvement of friction calculation method in fracturing operation[J].Drilling Production Technology,2002,25(5):41-43.
    [16]
    黄禹忠,何红梅.川西地区压裂施工过程中管柱摩阻计算[J].特种油气藏,2005,12(6):71-73. Huang Yuzhong,He Hongmei.Calculation of pipe string friction during fracturing operation in Chuanxi Area[J].Special Oil Gas Reservoirs,2005,12(6):71-73.

Catalog

    Article Metrics

    Article views (2914) PDF downloads (3704) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return