Citation: | Kong Hua, Liu Qiang, Zhang Qiang, Chao Wenxue, Wan Shuguang. Drilling Technologies for Horizontal Well Wei 68-FP1 in Shale Reservoir[J]. Petroleum Drilling Techniques, 2013, 41(3): 130-134. DOI: 10.3969/j.issn.1001-0890.2013.03.026 |
[1] |
闫存章,黄玉珍,葛春梅,等.页岩气是潜力巨大的非常规天然气资源[J].天然气工业,2009,29(5):1-6. Yan Cunzhang,Huang Yuzhen,Ge Chunmei,et al.Shale gas:enormous potential of unconventional natural gas resources[J].Natural Gas Industry,2009,29(5):1-6.
|
[2] |
Grieser Bill,Bray Jim.Identification of production potential in unconventional reservoirs.SPE 106623,2007.
|
[3] |
刘洪林,王红岩,刘人和,等.非常规油气资源发展现状及关键问题[J].天然气工业,2009,29(9):113-116. Liu Honglin,Wang Hongyan,Liu Renhe,et al.The present status and essential points of developing the unconventional hydrocarbon resources in China[J].Natural Gas Industry,2009,29(9):113-116.
|
[4] |
韩来聚,牛洪波,窦玉玲.胜利低渗油田长水平段水平井钻井关键技术[J].石油钻探技术,2012,40(3):7-12. Han Laiju,Niu Hongbo,Dou Yuling.Key drilling technologies for long displacement horizontal wells of low permeability reservoirs in Shengli Oilfield[J].Petroleum Drilling Techniques,2012,40(3):7-12.
|
[5] |
赵金洲,韩来聚,唐志军.高平1井大位移水平井钻井设计与施工[J].石油钻探技术,2010,38(6):29-32. Zhao Jinzhou,Han Laiju,Tang Zhijun.Design and drilling of Gaopin 1 ERD horizontal well[J].Petroleum Drilling Techniques,2010,38(6):31-34.
|
[6] |
崔海林,陈建隆,牛洪波,等.胜利油田首口小井眼长水平段水平井钻井技术[J].石油钻探技术,2011,39(5):14-18. Cui Hailin,Chen Jianlong,Niu Hongbo,et al.The first slim hole long horizontal-section horizontal well drilling technique in Shengli Oilfield[J].Petroleum Drilling Techniques,2011,39(5):14-18.
|
[7] |
裴建忠,刘天科,周飞,等.金平1浅层大位移水平井钻井技术[J].石油钻探技术,2009,37(1):87-90. Pei Jianzhong,Liu Tianke,Zhou Fei,et al.Horizontal drilling techniques to penetrate shallow formations in Well Jinping-1[J].Petroleum Drilling Techniques,2009,37(1):87-90.
|
[8] |
窦玉玲.长水平段大位移井井眼轨道优化设计[J].探矿工程:岩土钻掘工程,2011,38(7):50-52. Dou Yuling.Optimizing design of well trajectory for extended reach well with long horizontal section[J].Exploration Engineering:Rock Soil Drilling and Tunneling,2011,38(7):50-52.
|
[9] |
Al-Balushi H M,Al-Rashdi M H,AL-Shandoodi M H,et al.World longest expandable open hole clad open hole liner with swelling elastomer deployed in Yibal horizontal Well.IADC/SPE 88026,2004.
|
[10] |
刘修善.井眼轨道几何学[M].北京:石油工业出版社,2006:170-176. Liu Xiushan.Geometry of wellbore trajectory[M].Beijing:Petroleum Industry Press,2006:170-176.
|
[11] |
张炜,刘振东,刘宝峰,等.油基钻井液的推广及循环利用[J].石油钻探技术,2008,36(6):34-38. Zhang Wei,Liu Zhendong,Liu Baofeng,et al.Popularization and recycling of oil-based drilling fluid[J].Petroleum Drilling Techniques,2008,36(6):34-38.
|
[12] |
陈天成.坍塌压力与井身结构设计和井壁稳定技术关系初探[J].钻采工艺,2006,29(1):21-23. Chen Tiancheng.Relation of caving pressure with casing program and hole stability technique[J].Drilling Production Technology,2006,29(1):21-23.
|
[13] |
姚永辉,李庆铎,张永成.腰英台地区井壁稳定技术研究与应用[J].石油钻采工艺,2010,32(6):128-131. Yao Yonghui,Li Qingduo,Zhang Yongcheng.Study and application of wellbore stability techniques in Yaoyingtai Region[J].Oil Drilling Production Technology,2010,32(6):128-131.
|
[14] |
曹泽甫,张敏,刘明国,等.卫360-平1井C1+ GAMMA地质导向钻井技术[J].石油钻采工艺,2009,31(3):18-20. Cao Zefu,Zhang Min,Liu Mingguo,et al.C1+GAMMA geosteering drilling technology for Wei361-H1 Well[J].Oil Drilling Production Technology,2009,31(3):18-20.
|
[15] |
祁宏军,闫振来,唐志军,等.金平1井长水平段水平井的设计与施工[J].中外能源,2010,15(1):56-59. Qi Hongjun,Yan Zhenlai,Tang Zhijun,et al.Design and drilling of long horizontal-section well of Jinping 1 Well[J].Sino-Global Energy,2010,15(1):56-59.
|