Liu Huaizhu, Li Liangchuan. Study and Application of Micro Bubble Temporary Plugging Technology[J]. Petroleum Drilling Techniques, 2012, 40(6): 71-73. DOI: 10.3969/j.issn.1001-0890.2012.06.015
Citation: Liu Huaizhu, Li Liangchuan. Study and Application of Micro Bubble Temporary Plugging Technology[J]. Petroleum Drilling Techniques, 2012, 40(6): 71-73. DOI: 10.3969/j.issn.1001-0890.2012.06.015

Study and Application of Micro Bubble Temporary Plugging Technology

More Information
  • Received Date: March 14, 2012
  • Revised Date: October 07, 2012
  • The conventional method to plug channeling with cement is apt to pollute formation,and particle-type temporary blocking agents usually have short effective period.We tried to solve the two problems with micro bubble temporary plugging.The properties(shear thinning behaviors,static plugging,dynamic pollution and flow back)of micro bubble treatment fluid were evaluated by lab experiment.The results proved that the micro bubble treatment fluid had certain shear thinning behavoir,and strong plugging ability.At the temperature of 120℃,back pressure of 0.5 MPa and differential pressure of 5 MPa,the leakage of the fluid was 0.It had good flow back ability,and caused little damage to reservoir.Core permeability recovery ratio was up to 96.1% after pollution by it for forty-eight hours.The technology has been used on four wells in Jidong Oilfield.The working pressure was controllable during injection of micro bubble plugging fluid.The treatment resulted in a cumulative oil increment of 10 314 t,and the average water cut had declined by 17.6%,the effects of increasing oil production and reducing aquifer yield were obvious.Its application indicated that it had low operation risk,strong plugging ability,good reservoir protection effect,and long period of validity.
  • [1]
    闫丰明,康毅力,孙凯.裂缝-孔洞型碳酸盐岩储层暂堵性堵漏机理研究[J].石油钻探技术,2011,39(2):81-85. Yan Fengming,Kang Yili,Sun Kai.Mechanism of temporary sealing for fractured-vuggy carbonate reservoir[J].Petroleum Drilling Techniques,2011,39(2):81-85.
    [2]
    夏长淮,周海彬,刘强鸿,等.多层段水泥封窜及配套工艺技术[J].油气田地面工程,2010,29(5):39-40. Xia Changhuai,Zhou Haibin,Liu Qianghong,et al.Technology of multi-layer cement channeling and matching process[J].Oil-Gas Field Surface Engineering,2010,29(5):39-40.
    [3]
    贺鑫,李华斌,乔林,等.宝浪油田煤层水泥封堵体系室内研究[J].石油化工应用,2010,29(8):7-10. He Xin,Li Huabin,Qiao Lin,et al.Laboratory study of coal seam cement plugging/sealing technology in Baolang Oilfield[J].Petrochemical Industry Application,2010,29(8):7-10.
    [4]
    何光中,王研,张兴福,等.长井段水泥封窜技术研究[J].大庆石油地质与开发,2002,21(3):52-54. He Guangzhong,Wang Yan,Zhang Xingfu,et al.Research on plugging long channel wells with cement[J].Petroleum Geology Oilfield Development in Daqing,2002,21(3):52-54.
    [5]
    张丽梅.HPAM/Cr3+交联暂堵技术在堵水封窜中的应用[J].油田化学,2007,24(1):34-37. Zhang Limei.HPAM/Cr3+ gelling fluid for temporarily plugging/shielding and its use in sealing interzonal channeling[J].Oilfield Chemistry,2007,24(1):34-37.
    [6]
    王富华,邱正松,冯京海,等."超广谱"屏蔽暂堵钻井完井液新技术室内研究[J].石油钻探技术,2001,29(5):39-42. Wang Fuhua,Qiu Zhengsong,Feng Jinghai,et al.Lab study on the new techniques of superior shielding and temporary plugging drill-in fluids[J].Petroleum Drilling Techniques,2001,29(5):39-42.
    [7]
    卢淑芹,李家库,张淑霞,等.冀东油田G104-5区块水平井油气层保护技术[J].石油钻探技术,2005,33(4):45-48. Lu Shuqin,Li Jiaku,Zhang Shuxia,et al.Hydrocarbon zone protection technology of horizontal well in the G104-5 Block in the Jidong Oilfield[J].Petroleum Drilling Techniques,2005,33(4):45-48.
  • Related Articles

    [1]ZENG Hao, JIN Yan, WANG Haibo. Damage Mechanism and Countermeasures for Tight Oil Reservoirs in Ningdong Oilfield[J]. Petroleum Drilling Techniques, 2024, 52(1): 62-68. DOI: 10.11911/syztjs.2023109
    [2]LI Yunfeng, PAN Junying, ZHOU Yan, ZHU Kuanliang, WANG Zaiming. Key Technologies for Drilling and Completing Shallow Slim Hole Sidetracking Horizontal Wells in the Jidong Oilfield[J]. Petroleum Drilling Techniques, 2020, 48(6): 8-14. DOI: 10.11911/syztjs.2020090
    [3]WANG Bo, WANG Xu, XING Zhiqian, YUAN Zongling, LI Shijie. Drilling and Completion Technologies of Extended-Reach Wells in the Artificial Island of the Jidong Oilfield[J]. Petroleum Drilling Techniques, 2018, 46(4): 42-46. DOI: 10.11911/syztjs.2018118
    [4]LI Yunfeng, XU Ji, XU Xiaofeng, ZHU Kuanliang, WU Yan. Drilling and Completion Techniques for Horizontal Wells in the Deep Buried Hills of the Nanpu No.2 Structure[J]. Petroleum Drilling Techniques, 2018, 46(2): 10-16. DOI: 10.11911/syztjs.2018045
    [5]ZHU Kuanliang, ZHOU Yan, HU Zhongzhi. Application of a PDC-Roller Hybrid Bit in Highly-Deviated Wells of the Nanpu Oilfield[J]. Petroleum Drilling Techniques, 2017, 45(6): 60-64. DOI: 10.11911/syztjs.201706011
    [6]BIAN Ruichao, ZHOU Honglin, CAO Huaqing. Anti-Collision Technology for Drilling Cluster Wells in the Artificial Island of Jidong Oilfield[J]. Petroleum Drilling Techniques, 2017, 45(5): 19-22. DOI: 10.11911/syztjs.201705004
    [7]ZHANG Xiong, GENG Yudi, JIAO Kebo, HOU Fan, LUO Pandeng. The Technology of Multi-Stage Acid Fracturing in Horizontal Well for Carbonate Reservoir by Temporary Plugging Ways in the Tahe Oilfield[J]. Petroleum Drilling Techniques, 2016, 44(4): 82-87. DOI: 10.11911/syztjs.201604015
    [8]Li Yunfeng, Hu Zhongzhi, Xu Ji, Zhu Zhimin, Wang Pan. High-Inclination Directional Drilling Technology in Nanpu 1-3 Artificial Island[J]. Petroleum Drilling Techniques, 2014, 42(1): 61-65. DOI: 10.3969/j.issn.1001-0890.2014.01.012
    [9]Liu Xiaoping, Yan Jienian, Xing Xijin, Zhang Fengying. Completion Fluids with Low Formation Damage in AKPO,Nigeria[J]. Petroleum Drilling Techniques, 2012, 40(2): 59-65. DOI: 10.3969/j.issn.1001-0890.2012.02.012
    [10]Managed Pressure Drilling for Well Yagyi-1x in Block D of Myanma[J]. Petroleum Drilling Techniques, 2011, 39(4): 25-28. DOI: 10.3969/j.issn.1001-0890.2011.04.005

Catalog

    Article Metrics

    Article views (2890) PDF downloads (3198) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return