Yin Bangtang, Li Xiangfang, Li Qian, Fan Kun, Hu Airong. The Calculation Method of Bottomhole Pressure during Shut-in Period in High Temperature and High Pressure Gas Well[J]. Petroleum Drilling Techniques, 2012, 40(3): 87-91. DOI: 10.3969/j.issn.1001-0890.2012.03.018
Citation: Yin Bangtang, Li Xiangfang, Li Qian, Fan Kun, Hu Airong. The Calculation Method of Bottomhole Pressure during Shut-in Period in High Temperature and High Pressure Gas Well[J]. Petroleum Drilling Techniques, 2012, 40(3): 87-91. DOI: 10.3969/j.issn.1001-0890.2012.03.018

The Calculation Method of Bottomhole Pressure during Shut-in Period in High Temperature and High Pressure Gas Well

More Information
  • Received Date: September 02, 2011
  • Revised Date: February 09, 2012
  • In the conventional method of bottomhole pressure prediction it is assumed that the wellhead pressure is affected by the wellbore storage at the beginning of pressure buildup and by the afterflow in the late stage because of the temperature drop.And it is also assumed that there is no fluid flow in the wellbore after shut-in.However,according to testing results of some high pressure and high temperature wells in Kela-2 Gas Field,there was a pressure drop in the wellhead pressure build-up curve which is different from the conventional pressure build-up curve.The changing characteristics of wellbore temperature,the wellbore afterflow and the fluid parameters during the pressure build-up test then were analyzed.It is believed that the wellhead pressure or bottomhole pressure would be affected by both wellbore storage and wellbore temperature simultaneously.And there was afterflow in the wellbore during the whole test.So,the bottomhole pressure needs to be calculated by the flowing pressure equation.Based on the wellbore pressure build-up theory,the bottomhole pressure calculating model is established considering the effect of wellbore afterflow,the wellbore temperature changing and the fluid parameters changing.Taking one gas well for example,the pressure buildup curve calculated by this model is normal,and it can be applied for interpretation in the deliverability test.
  • [1]
    李士伦.天然气工程[M].北京:石油工业出版社,2008:85-134. Li Shilun.Natural gas engineering[M].Beijing:Petroleum Industry Press,2008:85-134.
    [2]
    陈元千.气井垂直管流计算方法的推导与应用[J].断块油气田,2010,17(4):443-447. Chen Yuanqian.Derivation and application of calculating methods of vertical pipe flow in gas wells[J].Fault-Block Oil Gas Field,2010,17(4):443-447.
    [3]
    Anklam E G,Wiggins M L.A review of horizontal-wellbore pressure equations.SPE 94314,2005.
    [4]
    杨涛,杨桦.利用气井环空气柱压力计算井底压力新方法的研究与应用[J].天然气工业,2001,21(2):66-70. Yang Tao,Yang Hua.Research on a new method of calculating bottomhole pressure by the gas column pressure in annular space of gas well and its application[J].Natural Gas Industry,2001,21(2):66-70.
    [5]
    唐海,李丽雄,曾凡华,等.气井油套合采时井底流压的计算方法[J].西南石油学院学报,2001,23(5):23-25. Tang Hai,Li Lixiong,Zeng Fanhua,et al.Method of wellbore pressure calculation for tubing-casing production system of gas wells[J].Journal of Southwest Petroleum Institute,2001,23(5):23-25.
    [6]
    廖新维,沈平平.现代试井分析[M].北京:石油工业出版社,2002:206-217. Liao Xinwei,Shen Pingping.Modern well test [M].Beijing:Petroleum Industry Press,2002:206-217.
    [7]
    冉新权,陈钦雷,赵必荣.气井井口压力恢复曲线异常的处理方法研究[J].天然气工业,1995,15(6):24-27. Ran Xinquan,Chen Qinlei,Zhao Birong.Treatment method reseach on wellhead pressure build up curve abnormality of gas well[J].Natural Gas Industry,1995,15(6):24-27.
    [8]
    Hasan A R,Kabir C S.Aspects of wellbore heat transfer during two-phase flow[J].SPE Production Facilities,1994,9(3):211-216.
    [9]
    Hasan A R,Kabir C S,Lin D Q.Analytic wellbore-temperature model for transient gas-well testing[J].SPE Reservoir Evaluation Engineering,2005,8(3):240-247.
    [10]
    李相方,任美鹏,胥珍珍,等.高精度全压力全温度范围天然气偏差系数解析计算模型[J].石油钻采工艺,2010,32(6):57-62. Li Xiangfang,Ren Meipeng,Xu Zhenzhen,et al.A high-precision and whole pressure range analytical calculation model of natural gas Z-factor[J].Oil Drilling Production Technology,2010,32(6):57-62.
    [11]
    Nickens H V.A dynamic computer model of a kicking well.SPE 14183,1987.
    [12]
    尹邦堂,李相方,隋秀香,等.计算机优化压井开环控制软件系统研究及应用[J].石油钻探技术,2011, 39(1):110-114. Yin Bangtang,Li Xiangfang,Sui Xiuxiang,et al.Research and application of computer optimization open-loop well killing software system[J].Petroleum Drilling Techniques,2011,39(1):110-114.
  • Related Articles

    [1]WANG Tao, LI Yao, HE Hui. A Coupling Allocation Model of Finely Layered Water Injection Considering Pressure Constraint[J]. Petroleum Drilling Techniques, 2023, 51(2): 95-101. DOI: 10.11911/syztjs.2023012
    [2]LIU Hui, DING Xinlu, ZHANG Shijie, FANG Yungui, HAO Xiaobo, ZHENG Weige. Integrated Calculation Method of Pressure and Formation Parameters in Gas Injection Process of Underground Gas Storage[J]. Petroleum Drilling Techniques, 2022, 50(6): 64-71. DOI: 10.11911/syztjs.2022047
    [3]WANG Chao, LI Jun, LIU Gonghui, JIANG Hailong, REN Kai, LIU Hanqing. Study on the Fluctuation of Bottomhole Pressure While Starting and Stopping the Drilling Pump[J]. Petroleum Drilling Techniques, 2018, 46(4): 47-53. DOI: 10.11911/syztjs.2018059
    [4]NIU Xinming, ZHANG Jinshuang, ZHOU Haobo. Technological Challenges and Countermeasures in Well Control of Ultra-Deep, Ultra-High Temperature and Ultra-High Pressure Oil and Gas Wells[J]. Petroleum Drilling Techniques, 2017, 45(4): 1-7. DOI: 10.11911/syztjs.201704001
    [5]Zhang Huawei, Guo Jinghua, Pang Xiaowang, Zhao Xiangyang, Zhao Guoquan. Managed Pressure Drilling Technique in the Well Y26ST of YD Oilfield[J]. Petroleum Drilling Techniques, 2015, 43(3): 35-40. DOI: 10.11911/syztjs.201503007
    [6]He Miao, Liu Gonghui, Li Jun, Li Mengbo, Zha Chunqing, Li Gen. Solution and Analysis of Fully Transient Temperature and Pressure Coupling Model for Multiphase Flow[J]. Petroleum Drilling Techniques, 2015, 43(2): 25-32. DOI: 10.11911/syztjs.201502005
    [7]Xu Honglin, Zhang Zhi, Shi Taihe, Xiong Jiyou. Stress Analysis of the Cement Sheath under both Pressure and Temperature[J]. Petroleum Drilling Techniques, 2014, 42(6): 45-48. DOI: 10.11911/syztjs.201406009
    [8]Su Qin, Zhao Xiangyang. The Research and Application of a Fine MPD Flow Model[J]. Petroleum Drilling Techniques, 2013, 41(1): 8-13. DOI: 10.3969/j.issn.1001-0890.2013.01.002
    [9]Yuan Guangyu. Current Status of Research and Performance Analysis of Depressure Tools for Jet Pump[J]. Petroleum Drilling Techniques, 2012, 40(4): 76-80. DOI: 10.3969/j.issn.1001-0890.2012.04.015
    [10]Yu Jifei, Li Li, He Baosheng, Guan Hongxiang, Li Weichao, Sui Xianfu. Wellhead Pressure Prediction Method during Well Shut-in for Offshore Flowing Oil Wells[J]. Petroleum Drilling Techniques, 2012, 40(1): 83-87. DOI: 10.3969/j.issn.1001-0890.2012.01.017

Catalog

    Article Metrics

    Article views (3824) PDF downloads (3490) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return