Well Equalizing Flowing Completion Technology to Delay and Control Bottom Water Coning in Horizontal Well[J]. Petroleum Drilling Techniques, 2011, 39(4): 66-71. DOI: 10.3969/j.issn.1001-0890.2011.04.014
|
Citation:
|
Well Equalizing Flowing Completion Technology to Delay and Control Bottom Water Coning in Horizontal Well[J]. Petroleum Drilling Techniques, 2011, 39(4): 66-71. DOI: 10.3969/j.issn.1001-0890.2011.04.014
|
Well Equalizing Flowing Completion Technology to Delay and Control Bottom Water Coning in Horizontal Well[J]. Petroleum Drilling Techniques, 2011, 39(4): 66-71. DOI: 10.3969/j.issn.1001-0890.2011.04.014
|
Citation:
|
Well Equalizing Flowing Completion Technology to Delay and Control Bottom Water Coning in Horizontal Well[J]. Petroleum Drilling Techniques, 2011, 39(4): 66-71. DOI: 10.3969/j.issn.1001-0890.2011.04.014
|