Citation: | SU Zhenguo, TANG Zhijun. The Design and Field Testing of Two-Stage and Two-Speed Drilling Tools[J]. Petroleum Drilling Techniques, 2019, 47(1): 59-64. DOI: 10.11911/syztjs.2019010 |
In order to fully exploit the technical advantages of PDC bit in rock breaking, and to further improve its ROP in low permeability formation drilling, a two-stage and two-speed drilling tool was studied and designed. A numerical simulation method was used to establish the bottom hole petrophysical model during the two-stage and two-speed drilling, stress field distribution and rock breaking/speed-up mechanisms of two-stage and two-speed drilling were analyzed. The common structure of two-stage and two-speed drilling tool and its technical advantages were presented. Based on the research results and field site requirements, the two-stage two-speed drilling tools for ϕ215.9, ϕ241.3 and ϕ311.1 mm diameter borehole were optimally designed considering flow rate, output torque and rotary speed, drilling tool length, etc.. The tool was tested in 3 wells of Shengli Oilfield and it showed that the WOB, pumping pressure and tool performance are stable, and the ROP is 80.37% higher than that of the offset wells with normal tools. The designed two-stage and two-speed drilling tool presents a good comprehensive performance and can be used to improve ROP in low permeability formation drilling with good application prospective.
[1] |
贾锁宏. 鄂北优快钻井技术研究与应用[J]. 石油钻探技术, 2006, 34(4): 38–39 doi: 10.3969/j.issn.1001-0890.2006.04.011
JIA Suohong. The study and application of rapid drilling techniques in north Erdos Basin[J]. Petroleum Drilling Techniques, 2006, 34(4): 38–39 doi: 10.3969/j.issn.1001-0890.2006.04.011
|
[2] |
张克勤. 提高普光气田开发井钻井速度的技术研究[J]. 石油钻探技术, 2009, 37(3): 34–37 doi: 10.3969/j.issn.1001-0890.2009.03.008
ZHANG Keqin. Researches on enhancing drilling speed of development wells in Puguang Gas Filed[J]. Petroleum Drilling Techniques, 2009, 37(3): 34–37 doi: 10.3969/j.issn.1001-0890.2009.03.008
|
[3] |
丁红, 陈杰, 王恩合, 等. 长7井复杂地层优快钻井技术[J]. 石油钻探技术, 2010, 38(1): 37–41 doi: 10.3969/j.issn.1001-0890.2010.01.010
DING Hong, CHEN Jie, WANG Enhe, et al. Well Chang-7 drilling measurements used in drilling complex zones[J]. Petroleum Drilling Techniques, 2010, 38(1): 37–41 doi: 10.3969/j.issn.1001-0890.2010.01.010
|
[4] |
穆国臣, 陈晓峰, 王雪. 松南地区深井钻井提速难点与对策[J]. 石油钻探技术, 2011, 39(6): 19–22 doi: 10.3969/j.issn.1001-0890.2011.06.005
MU Guochen, CHEN Xiaofeng, WANG Xue. Difficulties and applied technical strategy in deep well drilling in Songnan Area[J]. Petroleum Drilling Techniques, 2011, 39(6): 19–22 doi: 10.3969/j.issn.1001-0890.2011.06.005
|
[5] |
张金成, 张东清, 张新军. 元坝地区超深井钻井提速难点与技术对策[J]. 石油钻探技术, 2011, 39(6): 6–10 doi: 10.3969/j.issn.1001-0890.2011.06.002
ZHANG Jincheng, ZHANG Dongqing, ZHANG Xinjun. Difficulties of improving rate of penetration and its technical solutions in Yuanba Area[J]. Petroleum Drilling Techniques, 2011, 39(6): 6–10 doi: 10.3969/j.issn.1001-0890.2011.06.002
|
[6] |
BRETT J F, WARREN T M, BEHR S M. Bit whirl: a new theory of PDC bit failure[J]. SPE Drilling Engineering, 1990, 5(4): 275–281 doi: 10.2118/19571-PA
|
[7] |
MEYER-HEYE B, RECKMANN H, OSTERMEYER G P. Weight distribution increasing while drilling BHAs[R]. SPE 127094, 2011.
|
[8] |
MILLER G, CHILDERS. R Innovative concentric reamer enhances deepwater drilling operations[R]. SPE 84247, 2003.
|
[9] |
VEENINGEN D M. Novel high speed telemetry system with measurements along the string mitigate drilling risk and improve drilling efficiency[R]. SPE 143430, 2011.
|
[10] |
MARANUK C A, BASSARATH W D, ABALTUSOV N, et al. Application of targeted bit speed technology to directional drilling in Buzuluk Russia[R]. SPE 160660, 2012.
|
[11] |
MARTINEZ I R, FONTOURA S, INOUE N, et al. Simulation of single cutter experiments through finite element method[R]. SPE 163054, 2013.
|
[12] |
PINK T A, HARRELL L L, GARCIA D P, et al. Integrated drilling optimization and downhole drilling dynamics enables PDC bits to drill in the Colorado region of the San Juan unconventional gas basin[R]. SPE139848, 2011.
|
[13] |
HEMPHILL T, RAVI K. Modeling of effect of drill pipe rotation speed on wellbore cleanout[R]. SPE135703, 2010.
|