QU Gang, LI Yawei, YIN Wenbo, WANG Xinfeng. Development and Field Test of a Mobile Vibratory Cementing Device[J]. Petroleum Drilling Techniques, 2017, 45(5): 43-47. DOI: 10.11911/syztjs.201705008
Citation: QU Gang, LI Yawei, YIN Wenbo, WANG Xinfeng. Development and Field Test of a Mobile Vibratory Cementing Device[J]. Petroleum Drilling Techniques, 2017, 45(5): 43-47. DOI: 10.11911/syztjs.201705008

Development and Field Test of a Mobile Vibratory Cementing Device

More Information
  • Received Date: January 12, 2017
  • Revised Date: August 29, 2017
  • In order to overcome the problems of Russian mobile vibrators which include starting difficulties and limited running time,a set of mobile vibratory cementing devices suitable for ϕ139.7 mm casing was formed by optimizing the structures of eccentric blocks of vibrators based on mechanical analysis and matching surface electronic control system.They were formed after the development of downhole vibrators and simplification of pressure balance mechanism.Surface tests indicated that the mobile vibratory cementing device applicable to the well section with deviation angle less than 50° started easily and might work for a long time.Field tests indicated that the cementing quality of vibration cementing intervals were significantly improved by using the mobile vibratory cementing device for test wells.Compared with the same intervals in the adjacent wells without using vibration cementing,the high quality rate of the first interface and qualification rate of the second interface were improved by 17.5 and 45.0 per cent respectively.The research showed that self-developed mobile vibratory cementing device could overcome the defects of Russian mobile vibrators,and could be suitable for a domestic casing program and thus effectively improve the cementation quality of the first and second interfaces.
  • [1]
    丁士东,张克坚,高德利,等.新型井口脉冲振动固井装置的研制与应用[J].石油机械,2006,34(11):51-54. DING Shidong,ZHANG Kejian,GAO Deli,et al.Development and application of new type top cementing pulsation device[J].China Petroleum Machinery,2006,34(11):51-54.
    [2]
    DUSTERHOFT D,WILSON G,NEWMAN K.Field study on the use of cement pulsation to control gas migration[R].SPE 75689,2002.
    [3]
    NEWMAN K,WOJTANOWICZ A K,GAHAN,B C.Cement pulsation improves gas well cementing[J].World Oil,2001,222(7):89-94.
    [4]
    刘小利,夏宏南,王小建,等.水力脉冲振动技术提高固井质量的研究与应用[J].钻采工艺,2007,30(2):20-21. LIU Xiaoli,XIA Hongnan,WANG Xiaojian,et al.Research and application of water power vibratory impluse technique in improving cementing quality[J].Drilling Production Technology,2007,30(2):20-21.
    [5]
    李博.水力振荡器的研制与现场试验[J].石油钻探技术,2014,42(1):111-113. LI Bo.Development and pilot test of hydro-oscillator[J].Petroleum Drilling Techniques,2014,42(1):111-113.
    [6]
    RANKIN R E,RANKIN K T.Apparatus and method for vibrating a casing string during cementing:US 5152342[P].1992-10-06.
    [7]
    WEBB E,ROGERS H,SCHULTZ R.Methods for introducing pulsing to cementing operations:WO/2009/081088A2[P].2009-07-02.
    [8]
    韩玉安,孙艳龙,王洪潮,等.国内外振动固井技术的发展现状[J].钻采工艺,2000,23(4):27-30. HAN Yu’an,SUN Yanlong,WANG Hongchao,et al.Developing status quo of vibration cementing technique both in China and abroad[J].Drilling Production Technology,2000,23(4):27-30.
    [9]
    李玉海,赵立新,王军荣.振动固井技术综述[J].石油钻采工艺,1994,16(6):40-42. LI Yuhai,ZHAO Lixin,WANG Junrong.Overview of vibration cementing technology[J].Oil Drilling Production Technology,1994,16(6):40-42.
    [10]
    张大川,刁胜贤,李玉海.综合固井技术在胜利油田探井中的应用[J].石油钻采工艺,2004,26(4):24-26. ZHANG Dachuan,DIAO Shengxian,LI Yuhai.Application of comprehensive cementing technology in exploratory wells in Shengli Oilfield[J].Oil Drilling Production Technology,2004,26(4):24-26.
    [11]
    张子强,常焱.振动偏心轮结构设计及其有限元分析[J].江南大学学报(自然科学版),2011,10(5):573-577. ZHANG Ziqiang,CHANG Yan.Structure design of vibration eccentric and its finite element analysis[J].Journal of Southern Yangtze University(Natural Science Edition),2011,10(5):573-577.
    [12]
    蒋章方,刘袁平.电机内装插入式混凝土振动器机械振动性能参数计算[J].建设机械技术与管理,2010,23(1):109-115. JIANG Zhangfang,LIU Yuanping.Calculation of mechanical vibration parameters of inbuilt motor concrete vibrators[J].Construction Machinery Technology Management,2010,23(1):109-115.
  • Related Articles

    [1]HE Licheng. Research on a Polygonal Quartz Sand Flushing Fluid for Cementing Oil and Gas Wells and Its Field Application[J]. Petroleum Drilling Techniques, 2022, 50(3): 46-50. DOI: 10.11911/syztjs.2022064
    [2]HE Licheng. A Cementing Technology for Horizontal Shale Oil Wells in Shahejie Formation of Shengli Oilfield[J]. Petroleum Drilling Techniques, 2022, 50(2): 45-50. DOI: 10.11911/syztjs.2022062
    [3]XIE Guanbao. Establishment of Logging Evaluation Criteria for the Cementing Quality of Low-Density Cement Slurries[J]. Petroleum Drilling Techniques, 2022, 50(1): 119-126. DOI: 10.11911/syztjs.2022015
    [4]WU Tianqian, SONG Wenyu, TAN Lingfang, ZHANG Junyi, YANG Chunwen, GUO Shenglai. Evaluation Method for Cementing Quality of Ultra-Low-Density Cement[J]. Petroleum Drilling Techniques, 2022, 50(1): 65-70. DOI: 10.11911/syztjs.2021111
    [5]WU Bozhi, ZHANG Huaibing. Cementing Technology of a Self-Healing Cement Slurry in the Carbonate Formations in the Well Manshen 1[J]. Petroleum Drilling Techniques, 2021, 49(1): 67-73. DOI: 10.11911/syztjs.2020071
    [6]LI Jianshan. Challenges and Countermeasures of Well Cementing Operations for Horizontal Wells in the Jinghe Oilfield[J]. Petroleum Drilling Techniques, 2017, 45(6): 19-23. DOI: 10.11911/syztjs.201706004
    [7]WU Jiang, ZHU Xinhua, LI Yanjun, YANG Zhonghan. HTHP Liner Cementing Techniques in the Dongfang 13-1 Gas Field in the Yinggehai Basin[J]. Petroleum Drilling Techniques, 2016, 44(4): 17-21. DOI: 10.11911/syztjs.201604004
    [8]Bu Yuhuan, Song Wenyu, He Yingjun, Shen Zhaochao. Discussion of a Method for Evaluating Cementing Quality with Low-Density Cement Slurries[J]. Petroleum Drilling Techniques, 2015, 43(5): 49-55. DOI: 10.11911/syztjs.201505009
    [9]Guo Wenmeng, Dang Donghong, Zhu Zexin, Xu Minghui, Chen Guang, Huang Xia. Cementing Techniques of Mono-Bore Well Completion in Yishan Slope of Ordos Basin[J]. Petroleum Drilling Techniques, 2014, 42(4): 75-78. DOI: 10.3969/j.issn.1001-0890.2014.04.014
    [10]Yan Lianguo, Zhou Yucang. Horizontal Well Cementing Technology of Shale Gas Well Pengye HF-1[J]. Petroleum Drilling Techniques, 2012, 40(4): 47-51. DOI: 10.3969/j.issn.1001-0890.2012.04.010
  • Cited by

    Periodical cited type(4)

    1. 齐林山,尹宜勇,王立琰,曲从锋,于永金,刘斌辉,夏修建,张晓兵,白翰钦. 固井套管柱振动响应畸变相似关系确定方法研究. 机械工程学报. 2025(07): 406-420 .
    2. 尹宜勇,白翰钦,曲从锋,刘欢,王国强,王通,朱文佳. 基于动力学缩比和传递矩阵法的水平井基频求解方法. 中国石油大学学报(自然科学版). 2022(03): 158-165 .
    3. 马宏州. 多级脉冲固井振荡器在羊三木油田的试验分析. 中国设备工程. 2019(12): 106-107 .
    4. 王友文,袁进平,王兆会,尹宜勇,王微. 机械振动对油井水泥性能影响规律研究. 天然气与石油. 2019(05): 85-90 .

    Other cited types(3)

Catalog

    Article Metrics

    Article views (7673) PDF downloads (8474) Cited by(7)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return