Safety Analysis of the Hang-off of Deepwater Drilling Risers during a Typhoon Emergency Period

More Information
  • Received Date: April 20, 2015
  • Revised Date: June 15, 2015
  • For semi-submersible platforms, proper response procedures for a typhoon include the recovery of all drilling risers and travel away from typhoon paths. But it takes a long time to recover risers resulting that sometimes there is no guarantee that the entire riser system can be recovered. Under such circumstances, suspensions of risers are inevitable. This study took the suspended risers as the research objects, considering dynamic tension, bending stress, flex joint angle of risers and the space interference with the moon pool. With the analysis method of finite element, the axial dynamic model of risers in suspension mode was established. with a super deep water well in the South China Sea (with water depth of 2460 m) being taken as an example, analysis models for soft and hard riser suspension models were set up,a deep water typhoon evacuation strategy was studied, the influence of different suspension models were reviewed, and drilling ship evacuation speed and sailing azimuths on riser safety were analyzed. Results showed that in the hard suspension model, when the sailing speed was 2 kn, safe evacuation azimuth was 0° to 45°, while for soft hang-off mode, at the same sailing speed 2 kn, the sailing azimuth was from 0° to 90°. Under the same ocean conditions, the sailing speed of the drilling ship allowed by soft hang-off model was higher than that by hard hang-off. Therefore, the adaptive capacity of the soft model to the wave load was greater than that of the hard model, so the soft model was recommended to use preferentially during evacuations from typhoons.
  • [1]
    Brekke,J N.Key Elements inultra-deep water drilling riser management[R].SPE/IADC 67812,2001.
    [2]
    畅元江.深水钻井隔水管设计方法及其应用研究[D].东营:中国石油大学(华东)机电工程学院,2008. Chang Yuanjiang.Design approach and its application for deepwater drlling risers[D].Dongying:China University of Petroleum Engineering(Huadong),College of Mechanical and Electronic Engineering,2008.
    [3]
    畅元江,陈国明,许亮斌,等.超深水钻井隔水管设计影响因素[J].石油勘探与开发,2009,36(4):523-528. Chang Yuanjiang,Chen Guoming,Xu Liangbin,et al.Influential factors for the design of ultra-deepwater drilling risers[J].Petroleum Exploration and Development,2009,36(4):523-528.
    [4]
    孙友义,陈国明,畅元江.下放或回收作业状态下超深水钻井隔水管轴向动力分析[J].中国海上油气,2009,21(2):116-119. Sun Youyi,Chen Guoming,Chang Yuanjiang.Axial direction dynamic analysis on ultradeep-water drilling riser under setting down and recovery operations[J].China Offshore Oil and Gas,2009,21(2):116-119.
    [5]
    鞠少栋,畅元江,陈国明,等.超深水钻井作业隔水管顶张力确定方法[J].海洋工程,2011,29(1):100-104. Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Determination methods for the top tension of ultradeepwater drilling risers[J].The Ocean Engineering,2011,29(1):100-104.
    [6]
    鞠少栋,畅元江,陈国明,等.深水钻井隔水管连接作业窗口分析[J].石油勘探与开发,2012,39(1):105-110. Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Envelopes for connected operation of the deepwater drilling riser[J].Petroleum Exploration and Development,2012,39(1):105-110.
    [7]
    鞠少栋,畅元江,陈国明,等.深水钻井隔水管悬挂窗口确定方法[J].石油学报,2012,33(1):133-136. Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Determination of the hang-off window for deepwater drilling riser[J].Acta Petrolei Sinica,2012,33(1):133-136.
    [8]
    张磊,畅元江,刘秀全,等.深水钻井隔水管与防喷器紧急脱离后的反冲响应分析[J].石油钻探技术,2013,41(3):25-30. Zhang Lei,Chang Yuanjiang,Liu Xiuquan,et al.Recoil analysis for deepwater drilling riser after emergency disconnection with blowout preventer[J].Petroleum Drilling Techniques,2013,41(3):25-30.
  • Related Articles

    [1]QIN Saibo, YI Xianzhong, CAI Xingxing, ZHANG Xuwen, WANG Lijun, ZHANG Xiliang. Development and Safety Research of Dead Line Anchors for JGZ97 10 000-Meter Ultra-Deep Well Drilling Rig[J]. Petroleum Drilling Techniques, 2024, 52(2): 236-242. DOI: 10.11911/syztjs.2024036
    [2]ZHANG Zhiliang, WANG Wei, YI Ming, LIU Qiang. Design and Implementation of a Downhole Safety Monitoring System[J]. Petroleum Drilling Techniques, 2020, 48(6): 65-70. DOI: 10.11911/syztjs.2020094
    [3]LI Zifeng, HAN Jie. Discussion of Environmental Safety Factors in Subsea Natural Gas Hydrate Exploitation[J]. Petroleum Drilling Techniques, 2019, 47(3): 127-132. DOI: 10.11911/syztjs.2019064
    [4]ZHENG Xiaozhi, GU Lei, MA Lanrong, ZHANG Guoan. Performance and Field Tests of Rotary Expandable Liner Hanger[J]. Petroleum Drilling Techniques, 2016, 44(3): 55-60. DOI: 10.11911/syztjs.201603010
    [5]Chen Xiuping, Zou Deyong, Li Dongjie, Lou Erbiao. Numerical Simulation Study on the Anti-Balling Performance of PDC Drill Bits[J]. Petroleum Drilling Techniques, 2015, 43(6): 108-113. DOI: 10.11911/syztjs.201506020
    [6]Liu Zhengli, Zhang Hao, Yang Wenxue, Zhang Yuting, Chang Yuanjiang. The Dynamic Characteristics of Mooring Semi-Submersible Drilling Platform in Typhoon[J]. Petroleum Drilling Techniques, 2015, 43(4): 37-42. DOI: 10.11911/syztjs.201504007
    [7]Gong Zhiwu, Zhang Liang, Cheng Haiqing, Liu Yanmin, Ren Shaoran. The Influence of Subsea Natural Gas Hydrate Dissociation on the Safety of Offshore Drilling[J]. Petroleum Drilling Techniques, 2015, 43(4): 19-24. DOI: 10.11911/syztjs.201504004
    [8]Long Gang, Li Meng, Guan Zhichuan, Liao Hualin. Evaluation Method of Casing Safety and Reliability in Deep Wells[J]. Petroleum Drilling Techniques, 2013, 41(4): 48-53. DOI: 10.3969/j.issn.1001-0890.2013.04.011
    [9]Wang Jinbo, Wang Zhiyuan, Zhang Weiguo, Xie Hua, Sun Baojiang. Well Control Safety Operation Cycle during Typhoon at Deep Waters of South China Sea[J]. Petroleum Drilling Techniques, 2013, 41(3): 51-55. DOI: 10.3969/j.issn.1001-0890.2013.03.010
    [10]Zhao Xin, Qiu Zhengsong, Shi Bingzhong, Lin Yongxue, Gao Shuyang. Experimental Study on High Performance Polyamine Drilling Fluid for Deepwater Drilling[J]. Petroleum Drilling Techniques, 2013, 41(3): 35-39. DOI: 10.3969/j.issn.1001-0890.2013.03.007
  • Cited by

    Periodical cited type(15)

    1. LI Yan-wei,LIU Xiu-quan,WANG Jin-long,CHEN Guo-ming,CHANG Yuan-jiang,SHENG Lei-xiang. Dynamic Analysis of A Deepwater Drilling Riser with A New Hang-off System. China Ocean Engineering. 2024(01): 29-41 .
    2. 刘健,张红生,顾纯巍,李梦博,刘正礼,张春杰,王志坤. 深水钻井隔水管防台悬挂装置的选型设计. 中国海上油气. 2021(01): 133-139 .
    3. 苏国锦,乔维鹤,王耀峰. 全液压操作伸缩臂式隔水管卡盘装置研制与应用. 机械工程师. 2021(04): 123-125 .
    4. 陈锟,黄剑,冯超,韩雪莹,韦明吉,夏成宇. 深水隔水管系统安全作业窗口分析. 中国安全生产科学技术. 2021(06): 79-84 .
    5. 王荣耀,盛磊祥,许亮斌,刘秀全. 动力定位钻井作业装置漂移分析. 湖南城市学院学报(自然科学版). 2021(05): 48-53 .
    6. 张彦廷,王志坤,刘振东,黄鲁蒙,张慧明,王煜博. 基于动载补偿的隔水管柔性悬挂设计. 石油学报. 2020(03): 372-378 .
    7. 吴翔飞,畅元江,陈国明,刘秀全,张长帅. 深水钻井隔水管紧急解脱失效动态风险分析. 中国安全生产科学技术. 2019(02): 82-88 .
    8. 盛磊祥,许亮斌,刘健,李婷婷,刘正礼,田波,王志坤. 新型深水钻井隔水管悬挂系统设计. 海洋工程. 2019(05): 99-106 .
    9. 王荣耀,高宇清,廖逍钊,臧龙,张伟,陈国明. 台风对深海采矿海试的影响分析与对策. 矿业研究与开发. 2018(08): 135-138 .
    10. 周建良,许亮斌. 深水钻井隔水管关键技术研究进展. 中国海上油气. 2018(04): 135-143+213 .
    11. 吴国辉. 深水剪切闸板防喷器控制压力平衡装置研究. 石油机械. 2017(07): 58-61 .
    12. 刘秀全,陈国明,马秀梅,畅元江. 海洋石油981平台动力学仿真教学系统开发. 实验技术与管理. 2017(12): 132-137 .
    13. 许定江,练章华,林铁军,邓子麒. ABAQUS软件在油气井工程中的应用及分析. 断块油气田. 2016(04): 518-522 .
    14. 何新霞,张方芬,田秀娟,刘秀全. 深水钻井隔水管反冲控制系统建模与仿真. 石油机械. 2016(03): 63-67 .
    15. 刘秀全,李家仪,任克忍,许亮斌,畅元江,宋强. 基于反冲响应的深水钻井隔水管张紧力计算方法. 石油钻探技术. 2016(04): 47-51 . 本站查看

    Other cited types(19)

Catalog

    Article Metrics

    Article views (3463) PDF downloads (3852) Cited by(34)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return