Citation: | Meng Huixing, Chen Guoming, Zhu Yuan, Liu Xiuquan, Ju Shaodong. Emergency Techniques for a Simple Blowout Preventer in the Case of a Deepwater Blowout[J]. Petroleum Drilling Techniques, 2015, 43(3): 76-81. DOI: 10.11911/syztjs.201503015 |
[1] |
金业权,胡满,吴谦,等.Macondo深水井漏油事故防喷器系统失效原因分析[J].石油钻探技术,2014,42(4):53-58. Jin Yequan,Hu Man,Wu Qian,et al.Analysis of deepwater BOP failure in the Macondo Well accident[J].Petroleum Drilling Techniques,2014,42(4):53-58.
|
[2] |
魏超南,陈国明.深水地平线钻井平台井喷事故剖析与对策探讨[J].钻采工艺,2012,35(5):18-21. Wei Chaonan,Chen Guoming.Analysis and pecaution of the blowout on Deepwater Horizon rig[J].Drilling Production Technology,2012,35(5):18-21.
|
[3] |
高永海,孙宝江,曹式敬,等.应用事故树法对深水井控进行风险评估[J].石油钻采工艺,2008,30(2):23-27. Gao Yonghai,Sun Baojiang,Cao Shijing,et al.Risk assessment on well control in deepwater drilling based on fault tree analysis[J].Oil Drilling Production Technology,2008,30(2):23-27.
|
[4] |
付建民,郑晓云.井控作业危险性HAZOP分析技术[J].安全与环境工程,2005,12(4):89-91. Fu Jianmin,Zheng Xiaoyun.HAZOP technology on risk in well control operations[J].Safety and Environmental Engineering,2005,12(4):89-91.
|
[5] |
畅元江.深水钻井隔水管设计方法及其应用研究[D].青岛:中国石油大学(华东)机电工程学院,2008. Chang Yuanjiang.Designapproach and its application for deepwater drilling risers[D].Qingdao:China University of Petroleum(Huadong),College of Mechanical and Electromechanical Engineering,2008.
|
[6] |
National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling.Deep water:the gulf oil disaster and the future of offshore drilling[R].2011.
|
[7] |
孟会行,陈国明,朱渊,等.深水井喷应急技术分类及研究方向探讨[J].石油钻探技术,2012,40(6):27-32. Meng Huixing,Chen Guoming,Zhu Yuan,et al.Classification and discussion on the direction of emergency technology for deepwater blowout[J].Petroleum Drilling Techniques,2012,40(6):27-32.
|
[8] |
Hickman S H,Hsieh P A,Mooney W D,et al.Scientific basis for safely shutting in the Macondo Well after the April 20,2010 deepwater horizon blowout[J].PNAS,2012,109(50):20268-20273.
|
[9] |
Rassenfoss S.Well capping becomes an industry of its own[J].Journal of Petroleum Technology,2013,65(7):41-47.
|
[10] |
Chen Jack,Li Xunke,Xie Wenhui,et al.Capping stack:an industry in the making[J].Engineering Sciences,2013,11(4):17-23.
|
[11] |
Massey M.Marine well containment company progress[R].OTC 23596,2012.
|
[12] |
Hurzeler K.The development and maintenance of an "evergreen" spill response capability in the Gulf of Mexico[R].OTC 23691,2012.
|
[13] |
American Petroleum Institute.API RP 17W recommended practice for subsea capping stacks[S].
|
[14] |
Smith L M.A review of offshore blowouts and spills to determine desirable capabilities of a subsea capping stack[D].Baton Rouge:Louisiana State University,2012.
|
[15] |
Vinnem J E.Offshore risk assessment[M].London:Springer-Verlag,2007:164.
|
[16] |
孙友义.深水钻井隔水管强度评价方法及应用研究[D].青岛:中国石油大学(华东)机电工程学院,2009. Sun Youyi.Strength assessment for deepwater drilling riser and engineering application[D].Qingdao:China University of Petroleum(Huadong),College of Mechanical and Electromechanical Engineering,2009.
|
[17] |
鞠少栋,畅元江,陈国明,等.深水钻井隔水管连接作业窗口分析[J].石油勘探与开发,2012,39(1):105-110. Ju Shaodong,Chang Yuanjiang,Chen Guoming,et al.Envelopes for connected operation of the deepwater drilling riser[J].Petroleum Exploration and Development,2012,39(1):105-110.
|
[18] |
苏堪华.深水钻井井口力学分析及管承载能力研究[D].青岛:中国石油大学(华东)石油工程学院,2009. Su Kanhua.Analysis onmechanical stability of subsea wellhead and bearing capacity of conductor for deepwater drilling[D].Qingdao:China University of Petroleum(Huadong),School of Petroleum Engineering,2009.
|
[19] |
American Petroleum Institute.API RP53-1997 recommended practices for blowout prevention equipment systems for drilling wells[S].
|
[20] |
鞠少栋,陈国明,盛磊祥,等.基于CFD的深水隔水管螺旋列板几何参数优选[J].中国石油大学学报:自然科学版,2010,34(2):112-113. Ju Shaodong,Chen Guoming,Sheng Leixiang,et al.CFD-based optimization for geometric parameters of deepwater riser helical strakes[J].Journal of China University of Petroleum:Edition of Natural Science,2010,34(2):112-113.
|
[1] | ZHANG Dongqing, WAN Yunqiang, ZHANG Wenping, DAI Yongbo, ZHANG Jincheng, XU Mingbiao. Optimal and Fast Drilling Technologies for Stereoscopic Development of the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2023, 51(2): 16-21. DOI: 10.11911/syztjs.2022097 |
[2] | FAN Hongkang, LIU Jinge, ZANG Yanbin, ZHOU Xianhai, AI Jun, SONG Zheng. Drilling Technology for Adjustment Wells of the Jiaoshiba Block in the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2021, 49(3): 48-54. DOI: 10.11911/syztjs.2020122 |
[3] | LIU Yaowen, LI Mu. Evaluation on the Production Effect of Coiled Tubing in Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2020, 48(6): 99-103. DOI: 10.11911/syztjs.2020089 |
[4] | LIU Yanqian. Key Drilling Technologies of Infill Wells in the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2020, 48(5): 21-26. DOI: 10.11911/syztjs.2020039 |
[5] | LIU Huamin, LI Mu, LIU Qiaoping, ZHANG Liyuan. Research and Application of Plunger Gas Lift Technology in the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2020, 48(3): 102-107. DOI: 10.11911/syztjs.2020022 |
[6] | LIU Yaowen. Key Technologies of Green Development in the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2018, 46(5): 8-13. DOI: 10.11911/syztjs.2018115 |
[7] | PAN Jun, LIU Weidong, ZHANG Jincheng. Drilling Technology Progress and Recommendations for the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2018, 46(4): 9-15. DOI: 10.11911/syztjs.2018119 |
[8] | SHU Man, ZHAO Mingkun, XU Mingbiao. Plugging while Drilling Technology Using Oil-Based Drilling Fluid in Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2017, 45(3): 21-26. DOI: 10.11911/syztjs.201703004 |
[9] | YUE Shouqun, WANG Jinjie, SU Qianrong, CHANG Helei, CHEN Lin. The Optimization of Casing Programs for Horizontal Wells in the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2017, 45(1): 17-20. DOI: 10.11911/syztjs.201701003 |
[10] | ZHANG Jincheng, AI Jun, ZANG Yanbin, YANG Haiping, CHEN Xiaofeng. Multi-Well Pad Technology in the Fuling Shale Gas Field[J]. Petroleum Drilling Techniques, 2016, 44(3): 9-15. DOI: 10.11911/syztjs.201603002 |