Hu Liang, Gao Deli. Study on a Method for Tool Face Re-Orientation with Coiled Tubing Drilling[J]. Petroleum Drilling Techniques, 2015, 43(2): 50-53. DOI: 10.11911/syztjs.201502009
Citation: Hu Liang, Gao Deli. Study on a Method for Tool Face Re-Orientation with Coiled Tubing Drilling[J]. Petroleum Drilling Techniques, 2015, 43(2): 50-53. DOI: 10.11911/syztjs.201502009

Study on a Method for Tool Face Re-Orientation with Coiled Tubing Drilling

More Information
  • Received Date: October 12, 2014
  • Revised Date: February 05, 2015
  • In order to solve the problems in tool face orientation with coiled tubing drilling, this paper presents a method to drill a directional well with a two-section design. Based on the theory of azimuth correcting on an inclined-plane and the skill of re-orientating the tool face, a two-arc directional design model was established, and the corresponding constraint equations set for trajectory deign could be solved using numerical iteration method, so as to finalize the well trajectory design which would meet the requirements of directional drilling. Calculation results from an actual well design showed that re-orientation of tool face could meet the requirements of directional drilling, and the well trajectory was designed as a smooth curve within the all constraints of the well. The study results concluded that the two-arc directional design model could meet the needs of directional drilling and the theoretic design was feasible in drilling practice, so problems with directional correction had been solved that would be useful to the drilling practice on location.
  • [1]
    Byrom T G.Coiled-tubing drilling in perspective[J].Journal of Petroleum Technology,1999,51(6):57-61.
    [2]
    Fraser R G,Ravensbergen J.Improving the performance of coiled tubing underbalanced horizontal drilling operations[R].SPE 74841,2002.
    [3]
    Cox R J,Li Jeff,Lupick G S.Horizontal underbalanced drilling of gas wells with coiled tubing[J].SPE Drilling Completion,1999,14(1):3-10.
    [4]
    Scherschel S R,Graves D G.Underbalanced-directional drilling with coiled tubing:challenges and solutions[R].SPE 37062,1996.
    [5]
    Crouse P C,Lunan W B.Coiled tubing drilling: expanding application key to future[R].SPE 60706,2000.
    [6]
    宋先知,李根生,王梦抒,等.连续油管钻水平井岩屑运移规律数值模拟[J].石油钻探技术,2014,42(2):28-32. Song Xianzhi,Li Gensheng,Wang Mengshu,et al. Numerical simulation on cuttings carrying regularity for horizontal wells drilled with coiled tubing[J].Petroleum Drilling Techniques,2014,42(2):28-32.
    [7]
    吕选鹏,周承富,陈辉,等.连续管技术在页岩气勘探开发中应用前景[J].石油矿场机械,2012,41(2):67-70. Lv Xuanpeng,Zhou Chengfu,Chen Hui,et al.Coiled tubing technology prospect in exploration and development of shale gas[J].Oil Field Equipment,2012,41(2):67-70.
    [8]
    陈朝伟,周英操,申瑞臣,等. 连续管钻井减摩技术综述[J].石油钻探技术,2010,38(1):29-31. Chen Zhaowei,Zhou Yingcao,Shen Ruichen,et al. Overview of drag reducing technologies in coiled tubing drilling[J].Petroleum Drilling Techniques,2010,38(1):29-31.
    [9]
    Zegarra E,Meek D,Cassee U,et al.Intelligent wireless orienter for coiled tubing drilling:development to field test[R].SPE 74836,2002.
    [10]
    Garfield G L,Mackenzie G.Latest developments and new technology for coiled-tubing sidetracking applications[R].SPE 112587,2008.
    [11]
    贺会群.连续管钻井技术与装备[J].石油机械,2009,37(7):1-6. He Huiqun.The technology and equipment of coiled tubing drilling[J].China Petroleum Machinery,2009,37(7):1-6.
    [12]
    Turner D R,Harris T W R,Slater M,et al.Electric coiled tubing drilling:a smarter CT drilling system[R].SPE 52791,1999.
    [13]
    Tinkham S K,Meek D E,Staal T W.Wired BHA applications in underbalanced coiled tubing drilling[R].SPE 59161,2000.
    [14]
    刘修善.井眼轨道几何学[M].北京:石油工业出版社,2006:133-138. Liu Xiushan.Geometry of wellbore trajectory[M].Beijing:Petroleum Industry Press,2006:133-138.
    [15]
    高德利.复杂结构井优化设计与钻完井控制技术[M].东营:中国石油大学出版社,2011:3-5. Gao Deli.Optimized design and control techniques for drilling and completion of complex-structure wells[M].Dongying:China University of Petroleum Press,2011:3-5.
    [16]
    韩志勇.定向钻井设计与计算[M].东营:中国石油大学出版社,2007:285-291. Han Zhiyong.Design and calculation of directional drilling[M].Dongying:China University of Petroleum Press,2007:285-291.
    [17]
    鲁港,佟长海,夏泊洢,等.空间圆弧轨迹的矢量描述技术[J].石油学报,2014,35(4):759-764. Lu Gang,Tong Changhai,Xia Boyi,et al.Vector description of spatial-arc wellbore trajectory[J].Acta Petrolei Sinica,2014,35(4):759-764.
    [18]
    冯果忱.非线性方程组迭代解法[M].上海:上海科学技术出版社,1989:130-168. Feng Guochen.Iterative solution of nonlinear equations[M].Shanghai:Shanghai Science and Technology Press,1989:130-168.
  • Related Articles

    [1]ZHAO Jin, ZHAO Xing, CAI Peng, PENG Qi, RAO Jiaqi. Development of Coiled Tubing Jet Tools with Multi-Hole Nozzles and Cleaning Parameter Optimization[J]. Petroleum Drilling Techniques, 2023, 51(3): 83-89. DOI: 10.11911/syztjs.2023061
    [2]LAI Jianqiang, LU Gang, ZHOU Chao, LU Tianqi. Numerical Integral Calculation in Borehole Trajectory Model[J]. Petroleum Drilling Techniques, 2023, 51(3): 45-50. DOI: 10.11911/syztjs.2023004
    [3]ZHAO Xiangyang, ZHAO Cong, WANG Peng, LIANG Xiaoyang, YANG Mou. A Comparative Study on the Calculation Accuracy of Numerical and Analytical Models for Wellbore Temperature in Ultra-Deep Wells[J]. Petroleum Drilling Techniques, 2022, 50(4): 69-75. DOI: 10.11911/syztjs.2022035
    [4]YAO Xiaojiang, LU Huatao, SHANG Jie, WANG Qinghua, LI Yang. Optimization Design and Numerical Analysis of Flow Passage Converters in LWD Tools[J]. Petroleum Drilling Techniques, 2021, 49(5): 121-126. DOI: 10.11911/syztjs.2021069
    [5]AIBAIBU Abulimit, PANG Dexin, WANG Yiquan, GUO Xinwei, YANG Wenxin, JIAO Wenfu. The Research and Application of a Key Tool for Coiled Tubing Fishing with Coiled Tubing[J]. Petroleum Drilling Techniques, 2019, 47(6): 89-95. DOI: 10.11911/syztjs.2019117
    [6]ZHU Guanghai, LIU Zhangcong, XIONG Xudong, SONG Xuncheng, WANG Junheng, WENG Bo. Numerical Calculation Method of the Wellbore Temperature Field for Electric Heating Heavy Oil Thermal Recovery[J]. Petroleum Drilling Techniques, 2019, 47(5): 110-115. DOI: 10.11911/syztjs.2019109
    [7]LI Meng, HE Huiqun, XIN Yongan, LOU Erbiao, ZHANG Yunfei. Tool Face Orientation by Using an Electric-Hydraulic Orienter during Coiled Tubing Drilling[J]. Petroleum Drilling Techniques, 2016, 44(6): 48-54. DOI: 10.11911/syztjs.201606008
    [8]Song Xianzhi, Li Gensheng, Wang Mengshu, Yi Can, Su Xinliang. Numerical Simulation on Cuttings Carrying Regularity for Horizontal Wells Drilled with Coiled Tubing[J]. Petroleum Drilling Techniques, 2014, 42(2): 28-32. DOI: 10.3969/j.issn.1001-0890.2014.02.006
    [9]Li Chunying, Wu Xiaodong. Numerical Simulation of Remaining Oil Distribution in Cyclothem[J]. Petroleum Drilling Techniques, 2012, 40(1): 88-91. DOI: 10.3969/j.issn.1001-0890.2012.01.018
    [10]Diao Binbin, Gao Deli. Calculation Method of Adjacent Well Oriented Separation Factors[J]. Petroleum Drilling Techniques, 2012, 40(1): 22-27. DOI: 10.3969/j.issn.1001-0890.2012.01.005
  • Cited by

    Periodical cited type(11)

    1. 邢志晟,孔璐琳,祝传增,郑硕,焦滨海,蒋世东,李猛. 连续管钻井肋式定向器执行机构偏置位移优化. 石油机械. 2023(02): 26-32 .
    2. 马卫国,王力,王程飞. 连续管钻井电液双螺旋传动定向器的设计. 石油机械. 2020(04): 37-42 .
    3. 苗芷芃,夏宏南,南丽华,管锋. 连续管钻井液压定向器的研制. 石油机械. 2019(06): 22-27 .
    4. 胡方明. Prudhoe Bay油田老井连续管侧钻翼肋导向马达钻井实例分析. 江汉石油职工大学学报. 2019(06): 43-46 .
    5. 胡亮,阮臣良,崔晓杰,曹海涛,尹垒. 新型连续管钻井用电液定向装置的研制. 石油钻采工艺. 2019(06): 728-733 .
    6. 段文益,刘平国,刘菲,马青,郝军,胡志强. 连续管注入头驱动方式优化设计. 石油机械. 2017(11): 66-70 .
    7. 房军,韩晓菲,曾静,高德利. 承扭式连续管开窗钻具组合力学特性研究. 石油钻探技术. 2017(02): 46-53 . 本站查看
    8. 李猛,贺会群,苏堪华,万立夫,齐成伟. 连续管定向工具工作原理及工具面角度调整分析. 钻采工艺. 2017(01): 7-10+5 .
    9. 杜鑫芳,李志勇,王光明,徐克彬,徐昊洋,薛少春,周怡清. 热熔式内切割工艺在连续管解卡中的应用. 石油机械. 2016(05): 106-108 .
    10. 李猛,贺会群,张云飞. 连续管钻井电液定向器工具面角度调整分析. 石油机械. 2016(05): 1-7 .
    11. 李猛,贺会群,辛永安,娄尔标,张云飞. 连续管钻井电液定向装置工具面调整方法. 石油钻探技术. 2016(06): 48-54 . 本站查看

    Other cited types(5)

Catalog

    Article Metrics

    Article views (3305) PDF downloads (4345) Cited by(16)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return