KUANG Lixin, LIU Weidong, GAN Xinxing, JIANG Zhenghua, CHEN Shikui. Acceleration Potentials Analysis of Shale Gas Horizontal Well Drilling in the South Pingqiao Block of Fuling[J]. Petroleum Drilling Techniques, 2018, 46(4): 16-22. DOI: 10.11911/syztjs.2018102
Citation: KUANG Lixin, LIU Weidong, GAN Xinxing, JIANG Zhenghua, CHEN Shikui. Acceleration Potentials Analysis of Shale Gas Horizontal Well Drilling in the South Pingqiao Block of Fuling[J]. Petroleum Drilling Techniques, 2018, 46(4): 16-22. DOI: 10.11911/syztjs.2018102

Acceleration Potentials Analysis of Shale Gas Horizontal Well Drilling in the South Pingqiao Block of Fuling

More Information
  • Received Date: November 26, 2017
  • The Fuling South Pingqiao Block is the main production area for the second phase of the productivity construction of Fuling Shale Gas field.This paper provides technical reference and guidance for further accelerating the development and improving the efficiency of this block,and for the efficient exploration and development of subsequent peripheral blocks.First,the current drilling technical systems of this block were analyzed.Based on the mature experiences of Fuling Phase I,rotary steering drilling technology was applied in the drilling scheme.At the same time,foam cementing test was carried out while geo-steering while drilling technique was improved to establish the drilling technical systems with regional characteristics.The combination of improvements greatly reduced the drilling cycle compared with the initial stage of development.On this basis,taking the stratum and spud times as the boundaries,the acceleration potentials and challenges in South Pingqiao Block were analyzed.It was found that the second spud section presented the maximum acceleration potentials,and the challenges limiting acceleration were the low ROP and small single bit footage in the Longtan Formation/Maokou Formation of the second spud section,as well as the long drilling period and frequent lost circulation in the Hanjiadian Formation and the Xiaoheba Formation,etc.In view of the difficulties of acceleration,the technical plans for acceleration with rotary/percussion drilling and lost circulation control with pressure control and density management were developed.The research results could provide guidanceand serve as a model to accelerate the exploration and development of the South Pingqiao Block of the Fuling Gas Field.
  • [1]
    梁文利,宋金初,陈智源,等.涪陵页岩气水平井油基钻井液技术[J].钻井液与完井液,2016,33(5):19-24. LIANG Wenli,SONG Jinchu,CHEN Zhiyuan et al.Oil base drilling fluid for drilling shale gas wells in Fuling[J].Drilling Fluid Completion Fluid,2016,33(5):19-24.
    [2]
    唐文泉,高书阳,王成彪,等.龙马溪页岩井壁失稳机理及高性能水基钻井液技术[J].钻井液与完井液,2017,34(3):21-26. TANG Wenquan,GAO Shuyang,WANG Chengbiao,et al.Research on mechanisms of wellbore instability of Longmaxi shale formation and high performance water base drilling fluid technology[J].Drilling Fluid Completion Fluid,2017,34(3):21-26.
    [3]
    何龙,胡大梁,朱弘.丁页2HF页岩气水平井钻井技术[J].石油钻探技术,2014,42(4):125-130. HE Long,HU Daliang,ZHU Hong.Drilling technologies for shale gas horizontal Well Dingye 2HF[J].Petroleum Drilling Techniques,2014,42(4):125-130.
    [4]
    乐守群,王进杰,苏前荣,等.涪陵页岩气田水平井井身结构优化设计[J].石油钻探技术,2017,45(1):17-20. YUE Shouqun,WANG Jinjie,SU Qianrong,et al.The Optimization of casing programs for horizontal wells in the Fuling Shale Gas Field[J].Petroleum Drilling Techniques,2017,45(1):17-20.
    [5]
    刘明国,孔华,兰凯,等.焦石坝区块φ311.2 mm井眼定向段钻头优选与应用[J].石油钻采工艺,2015,37(3):28-31. LIU Mingguo,KONG Hua,LAN Kai,et al.Selection and application of drill bit for directional section of φ311.2 mm well in Jiaoshiba Block[J].Oil Drilling Production Technology,2015,37(3):28-31.
    [6]
    牛新明.涪陵页岩气田钻井技术难点及对策[J].石油钻探技术,2014,42(4):1-6. NIU Xinming.Drilling technology challenges and resolutions in Fuling Shale Gas Field[J].Petroleum Drilling Techniques,2014,42(4):1-6.
    [7]
    张金成,孙连忠,王甲昌,等."井工厂"技术在我国非常规油气开发中的应用[J].石油钻探技术,2014,42(1):20-25. ZHANG Jincheng,SUN Lianzhong,WANG Jiachang,et al.Application of multi-well pad in unconventional oil and gas development in China[J].Petroleum Drilling Techniques,2014,42(1):20-25.
    [8]
    周贤海.涪陵焦石坝区块页岩气水平井钻井完井技术[J].石油钻探技术,2013,41(5):26-30. ZHOU Xianhai.Drilling completion techniques used in shale gas horizontal wells in Jiaoshiba Block of Fuling Area[J].Petroleum Drilling Techniques,2013,41(5):26-30.
    [9]
    艾军,张金成,臧艳彬,等.涪陵页岩气田钻井关键技术[J].石油钻探技术,2014,42(5):9-15. AI Jun,ZHANG Jincheng,ZANG Yanbin,et al.The key drilling technologies in Fuling Shale Gas Field[J].Petroleum Drilling Techniques,2014,42(5):9-15.
    [10]
    葛洪魁,王小琼,张文.大幅度降低页岩气开发成本的技术途径[J].石油钻探技术,2013,41(3):1-5. GE Hongkui,WANG Xiaoqiong,ZHANG Wen.A technical approach to reduce shale gas development cost[J].Petroleum Drilling Techniques,2013,41(3):1-5.
    [11]
    孙坤忠,刘江涛,王卫,等.川东南JA侧钻水平井地质导向技术[J].石油钻探技术,2015,43(4):138-142. SUN Kunzhong,LIU Jiangtao,WANG Wei,et al.Geosteering drilling techniques of horizontal sidetracking Well JA,Southeast Sichuan[J].Petroleum Drilling Techniques,2015,43(4):138-142.
    [12]
    肖京男,刘建,桑来玉,等.充气泡沫水泥浆固井技术在焦页9井的应用[J].断块油气田,2016,23(6):835-837. XIAO Jingnan,LIU Jian,SANG Laiyu,et a1.Application of foamed cement slurry to Jiaoye 9 Well[J].Fault-Block Oil Gas Field,2016,23(6):835-837.
    [13]
    舒曼,赵明琨,许明标.涪陵页岩气田油基钻井液随钻堵漏技术[J].石油钻探技术,2017,45(3):21-26. SHU Man,ZHAO Mingkun,XU Mingbiao.Plugging while drilling technology using oil-based drilling fluid in Fuling Shale Gas Field[J].Petroleum Drilling Techniques,2017,45(3):21-26.
    [14]
    唐守宝,卢倩,宋一磊,等.控压钻井技术在页岩气钻探中的应用前景[J].石油钻采工艺,2014,36(1):14-17. TANG Shoubao,LU Qian,SONG Yilei,et al.Application prospect of MPD technology in shale gas drilling[J].Oil Drilling Production Technology,2014,36(1):14-17.
  • Cited by

    Periodical cited type(1)

    1. 张涛, 杨振鹏, 李军, 王苗瑞, 王梦凡, 郭子娴. 基于近钻头测量数据的钻柱涡动特性分析. 石油机械. 2025(07)

    Other cited types(0)

Catalog

    Article Metrics

    Article views (4131) PDF downloads (5505) Cited by(1)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return