Li Cui, Gao Deli. Preliminary Research on Detection Method for Connecting Relief Well to Blowout Well[J]. Petroleum Drilling Techniques, 2013, 41(3): 56-61. DOI: 10.3969/j.issn.1001-0890.2013.03.011
Citation: Li Cui, Gao Deli. Preliminary Research on Detection Method for Connecting Relief Well to Blowout Well[J]. Petroleum Drilling Techniques, 2013, 41(3): 56-61. DOI: 10.3969/j.issn.1001-0890.2013.03.011

Preliminary Research on Detection Method for Connecting Relief Well to Blowout Well

More Information
  • Received Date: November 27, 2012
  • Revised Date: April 06, 2013
  • At present drilling relief well is the most reliable method to completely solve serious blowout accidents,and it is a key link to accurately detect relative position of relief well and blowout well.In order to connect relief well to blowout well successfully,calculation method of using detection tool to connect relief well with blowout well was studied in this paper.Blowout well casing was approximated to a cylinder,through analyzing the spread and attenuation pattern of current injected by down-hole electrode and then concentrated on blowout well casing,the calculation method to determine the distance and orientation from relief well to blowout well was obtained,and meanwhile illustrated the influences of some parameters on detection accuracy of this tool,such as the magnitude of current injected by down-hole electrode and the spacing of down-hole electrode and sensor.The results showed that this detection tool and calculation method of determining distance and orientation from relief well to blowout well can guide relief well to connect to blowout well vertically or laterally.It was concluded from analysis that the detection tool for connecting relief well to blowout well could meet engineering requirement of steerable drilling of relief well essentially.
  • [1]
    郭永峰,纪少君,唐长全.救援井:墨西哥湾泄油事件的终结者[J].国外油田工程,2010,26(9):64-65. Guo Yongfeng,Ji Shaojun,Tang Changquan.Relief well:the terminator of the oil spill in the Gulf of Mexico[J].Foreign Oilfield Engineering,2010,26(9):64-65.
    [2]
    Grace R D. Blowout and well control handbook[M].Oxford:Gulf Professional Publishing, 2003:90-102.
    [3]
    Leraand F,Wright J W,Zachary M B,et al.Relief-well planning and drilling for a North Sea underground blowout[J].Journal of Petroleum Technology,1992,44(3):266-273.
    [4]
    Grace R D,Kuckes A F,Branton J.Operations at a deep relief well:the TXO marshall.SPE 18059,1988.
    [5]
    刁斌斌,高德利.救援井与事故井邻井距离探测技术:第十六届全国探矿工程(岩土钻掘工程)技术学术交流年会,南宁,2011-10-09—12. Diao Binbin,Gao Deli.Adjacent well distance detection technology of the relief well and the blowout well:the sixteenth national academic annual meeting of prospecting engineering technology(rock and soil drilling engineering),Nanning,October 9-12,2011.
    [6]
    王德桂,高德利.管柱形磁源空间磁场矢量引导系统研究[J].石油学报,2008,29(4):608-611. Wang Degui,Gao Deli.Study of magnetic vector guide system in tubular magnet source space[J].Acta Petrolei Sinica,2008,29(4):608-611.
    [7]
    刁斌斌,高德利.螺线管随钻测距导向系统[J].石油学报,2011,32(6):1061-1066. Diao Binbin,Gao Deli.A solenoid ranging guidance system while drilling[J].Acta Petrolei Sinica,2011,32(6):1061-1066.
    [8]
    Kuckes A F,Hay R T,Mcmahon J,et al.An electromagnetic survey method for directionally drilling a relief well into a blown out oil or gas well[J].SPE Journal,1984,24(3):269-274.
    [9]
    Bruist E H.A new approach in relief well drilling[J].Journal of Petroleum Techology,1972,24(6):713-722.
    [10]
    Arnwine L C,Ely J W.Polymer use in blowout control[J].Journal of Petroleum Techology,1978,30(5):705-711.
    [11]
    West C L,Kuckes A F,Cornell U,et al.Successful ELREC logging for casing proximity in an offshore Louisiana blowout.SPE 11996,1983.
    [12]
    陈小斌,赵国泽.关于人工源极低频电磁波发射源的讨论:均匀空间交流点电流源的解[J].地球物理学报,2009,52(8):2158-2164. Chen Xiaobin,Zhao Guoze.Study on the transmitting mechanism of CSELF waves: response of the alternating current point source in the uniform space[J].Chinese Journal of Geophysics,2009,52(8):2158-2164.
    [13]
    Morris F J,Walters R L,Roberts G F,et al.A new method of determining range and direction from a relief well to a blowout.SPE 6781,1977.
    [14]
    王宏光,肖利民,赵海艳.连通水平井工程设计与井眼轨迹控制技术[J].石油钻探技术,2007,35(2):76-78. Wang Hongguang,Xiao Limin,Zhao Haiyan.Design of interconnecting horizontal wells and wellbore trajectory control technique[J].Petroleum Drilling Techniques,2007,35(2): 76-78.
    [15]
    孙东奎,高德利,刁斌斌,等.RMRS在稠油/超稠油开发中的应用[J].石油机械,2011,39(7):73-76. Sun Dongkui,Gao Deli,Diao Binbin,et al.Application of RMRS in the exploitation of heavy oil and super heavy oil[J].China Petroleum Machinery,2011,39(7):73-76.
    [16]
    杨力.和顺地区煤层气远端水平连通井钻井技术[J].石油钻探技术,2010,38(3):40-43. Yang Li.Remote-end horizontal communication drilling technology for coal bed methane in Heshun Block[J].Petroleum Drilling Techniques,2010,38(3):40-43.
    [17]
    吴敬涛,杨彦明,周继坤,等.连通水平井钻井技术在芒硝矿中的应用[J].石油钻探技术,1999,27(4):7-9. Wu Jingtao,Yang Yanming,Zhou Jikun,et al.Application of interconnected horizontal well drilling technology in mirabilite[J].Petroleum Drilling Techniques,1999,27(4):7-9.
  • Related Articles

    [1]LI Fuqiang, SONG Zhaohui, YI Ming, LIU Hongtao, ZHANG Sen, DIAO Binbin. Calculation of Optimal Distance Between Electrode and Probe in Relief Well Magnetic Ranging[J]. Petroleum Drilling Techniques, 2024, 52(3): 34-39. DOI: 10.11911/syztjs.2024008
    [2]XU Xiaokai, ZHAO Weina, ZHANG Jinyan, DONG Jingli, SUN Qingxi, WANG Lei. Recursive Algorithm for Electromagnetic Fields from Magnetic Dipole in Layered Triaxial Anisotropic Medium and Its Application[J]. Petroleum Drilling Techniques, 2024, 52(1): 130-139. DOI: 10.11911/syztjs.2023117
    [3]YU Ruifeng, DIAO Binbin, GAO Deli. Optimal Selection Method of Magnetic Ranging Tools for Relief Well Engineering Based on the Measurement Error of the Adjacent Well Distance[J]. Petroleum Drilling Techniques, 2021, 49(6): 118-124. DOI: 10.11911/syztjs.2021129
    [4]HAO Xining, WANG Yu, DANG Bo, LI Fengfei, XU Liangbin, LIU Zhengli. Research on Electromagnetic Detection and Positioning Methods and Tools for Relief Wells[J]. Petroleum Drilling Techniques, 2021, 49(3): 75-80. DOI: 10.11911/syztjs.2021005
    [5]HE Jibiao, PENG Xiaoping, LIU Junjun, QU Yong, YUAN Huan, PENG Bo. Development of an Anti-Deformation Cement Slurry under Alternative Loading and Its Application in Fuling Shale Gas Wells[J]. Petroleum Drilling Techniques, 2020, 48(3): 35-40. DOI: 10.11911/syztjs.2020054
    [6]FAN Guangdi, PU Wenxue, ZHAO Guoshan, HUANG Genlu. Correction Methods for Axial Magnetic Interference of the Magnetic Inclinometer while Drilling[J]. Petroleum Drilling Techniques, 2017, 45(4): 121-126. DOI: 10.11911/syztjs.201704021
    [7]Liu Yu, Ai Chi. Opening of Natural Fractures under Induced Stress in Multi-Stage Fracturing[J]. Petroleum Drilling Techniques, 2015, 43(1): 20-26. DOI: 10.11911/syztjs.201501004
    [8]Xu Haodong, Huang Genlu, Zhang Ran, Wei Hongshu, Cheng Fengrui. Method of Magnetic Interference Correction in Survey with Magnetic MWD[J]. Petroleum Drilling Techniques, 2014, 42(2): 102-106. DOI: 10.3969/j.issn.1001-0890.2014.02.020
    [9]Zong Yanbo. Development and Field Test of Rotating Magnetic MWD Range Finder[J]. Petroleum Drilling Techniques, 2012, 40(6): 110-114. DOI: 10.3969/j.issn.1001-0890.2012.06.023
    [10]Yan Rentian, Wang Feng, Zhang Deping, Zhu Hongjun, Zeng Dezhi. Failure Analysis of API Tubing Round Threaded Connection Induced by Flow Field[J]. Petroleum Drilling Techniques, 2012, 40(5): 111-114. DOI: 10.3969/j.issn.1001-0890.2012.05.024

Catalog

    Article Metrics

    Article views (3032) PDF downloads (3368) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return