Citation: | Jiang Zhao, Guo Jinghua, Wang Zijin, Huang Zaifu, Wang Xuejie. Discussion on Safe Drilling Technologies for the Asphalt Layer in the YD Oilfield[J]. Petroleum Drilling Techniques, 2015, 43(3): 7-12. DOI: 10.11911/syztjs.201503002 |
[1] |
Romo L A,Shaughnessy J M,Lisle Ed T.Challenges associated with subsalt tar in the Mad Dog Field[R].SPE 110493,2007.
|
[2] |
Weatherl M H.Encountering an unexpected tar formation in a deepwater Gulf of Mexico exploration well[R].SPE 105619,2007.
|
[3] |
Han G,Hunter K C,Osmond J,et al.Drilling through bitumen in Gulf of Mexico:the shallower vs the deeper[R].OTC 19307,2008.
|
[4] |
Markestad P,Christie O,Espedal A,et al.Selection of screen slot width to prevent plugging and sand production[R].SPE 31087,1996.
|
[5] |
张敬荣.喷漏共存的堵漏压井技术[J].钻采工艺,2008,31(5):30-33. Zhang Jingrong.Well killing technology for wells with blowout and lost circulation coexisting[J].Drilling Production Technology,2008,31(5):30-33.
|
[6] |
李大奇,康毅力,曾义金,等.缝洞型储层缝宽动态变化及其对钻井液漏失的影响[J].中国石油大学学报:自然科学版,2011,35(5):76-81. Li Daqi,Kang Yili,Zeng Yijin,et al.Dynamic variation of fracture width and its effects on drilling fluid lost circulation in fractured vuggy reservoirs[J].Journal of China University of Petroleum:Edition of Natural Science,2011,35(5):76-81.
|
[7] |
侯立中,何青水,何汉平,等.控压钻井技术在伊朗雅达油田S03井的应用[J].科学技术与工程,2014,14(18):204-208. Hou Lizhong,He Qingshui,He Hanping,et al.Managed pressure drilling technique applied in Well S03 of YADA Oilfield,Iran[J].Science Technology and Engineering,2014,14(18):204-208.
|
[8] |
王治法,肖超,侯立中,等.伊朗雅达油田复杂地层钻井液技术[J].钻井液与完井液,2012,29(5):40-43. Wang Zhifa,Xiao Chao,Hou Lizhong,et al.Drilling fluid technology for troublesome formation in Yadavaran Oil Field of Iran[J].Drilling Fluid Completion Fluid,2012,29(5):40-43.
|
[9] |
刘金华,刘四海,陈小锋,等.承压堵漏技术研究及其应用[J].断块油气田,2011,18(1):116-118,125. Liu Jinhua,Liu Sihai,Chen Xiaofeng,et al.Study and application of pressure bearing and lost circulation technique[J].Fault-Block Oil Gas Field,2011,18(1):116-118,125.
|
[10] |
何青水,宋明全,肖超,等.非均质超厚活跃沥青层安全钻井技术探讨[J].石油钻探技术,2013,41,(1):20-24. He Qingshui,Song Mingquan,Xiao Chao,et al.Discussion on safe drilling technology for heterogeneous,ultra-thick and active bitumen zone[J].Petroleum Drilling Techniques,2013,41(1):20-24.
|
[11] |
任立伟,夏柏如,唐文泉,等.伊朗稠油沥青稠化封堵技术研究与应用Ⅰ:原位氧化[J].科技导报,2013,31(23):31-35. Ren Liwei,Xia Bairu,Tang Wenquan,et al.Technology research and apply on the bodying and sealing of bitumen in Iran Ⅰ:in-situ oxidation[J].Science Technology Review,2013,31(23):31-35.
|
[12] |
杨顺辉,金军斌,牛成成,等.一种沥青固化剂的研究与应用[J].科学技术与工程,2014,14(21):200-204. Yang Shunhui,Jin Junbin,Niu Chengcheng,et al.The research and application of one bituminization agent[J].Science Technology and Engineering,2014,14(21):200-204.
|
[13] |
任立伟,夏柏如,唐文泉,等.伊朗Y油田深部复杂地层钻井液技术[J].石油钻探技术,2013,41(4):92-96. Ren Liwei,Xia Bairu,Tang Wenquan,et al.Drilling fluid technology for deep troublesome formation of Y Oilfield in Iran[J].Petroleum Drilling Techniques,2013,41(4):92-96.
|
[14] |
金军斌,杨顺辉,张洪宝,等.钻井液用沥青质稠油硬化剂的研究与应用[J].石油钻探术,2014,42,(1):50-54. Jin Junbin,Yang Shunhui,Zhang Hongbao,et al.Development and application of a hardening agent for asphaltic heavy oil in drilling fluid[J].Petroleum Drilling Techniques,2014,42(1):50-54.
|
[15] |
蒋宏伟,周英操,赵庆,等.控压钻井关键技术研究[J].石油矿场机械,2012,41(1):1-5. Jiang Hongwei,Zhou Yingcao,Zhao Qing,et al.Study of key technology of managed pressure drilling[J].Oil Field Equipment,2012,41(1):1-5.
|
[16] |
金军斌,何青水,唐文泉,等.Y油田超厚沥青层安全钻进分强度控制技术[J].石油钻探术,2015,43(1):63-68. Jin Junbin,He Qingshui,Tang Wenquan,et al.Contamination control technique for safe drilling in ultra-thick asphalt layer in Y Oilfield[J].Petroleum Drilling Techniques,2015,43(1):63-68.
|
[17] |
Kunning J,Wu Y,Thomson I,et al.Non-retrievable rotating liner drilling system successfully deployed to overcome challenging highly stressed rubble zone in a GOM ultra-deep-water salt application[R].SPE 124854,2009
|
[1] | LIU Wei, ZHOU Yingcao, SHI Xitian, WANG Ying, LEI Wanneng, LI Mu. Precise Managed Pressure Drilling Technology for Ultra-High Pressure Brine Layer in the Kuqa Piedmont of the Tarim Oilfield[J]. Petroleum Drilling Techniques, 2020, 48(2): 23-28. DOI: 10.11911/syztjs.2020034 |
[2] | HUANG Weian, NIU Xiao, SHEN Qingyun, ZHOU Wei, YANG Shichao, QIU Zhengsong. Anti-Sloughing Drilling Fluid Technology for Deep Sidetracking Wells in the Tahe Oilfield[J]. Petroleum Drilling Techniques, 2016, 44(2): 51-57. DOI: 10.11911/syztjs.201602009 |
[3] | Zheng Mingxue, Huang Zaifu, Luo Bing, Wang Xuejie, Liu Huanle. Gas-Lift Horizontal Well Completion Techniques for the Sarvak Reservoir of the YD Oilfield[J]. Petroleum Drilling Techniques, 2015, 43(3): 41-44. DOI: 10.11911/syztjs.201503008 |
[4] | Zhang Huawei, Guo Jinghua, Pang Xiaowang, Zhao Xiangyang, Zhao Guoquan. Managed Pressure Drilling Technique in the Well Y26ST of YD Oilfield[J]. Petroleum Drilling Techniques, 2015, 43(3): 35-40. DOI: 10.11911/syztjs.201503007 |
[5] | Fang Xiang, Shang Xitao, Wang Xiao. The Logging Evaluation Method of Carbonate Reservoir in the YD Oifield[J]. Petroleum Drilling Techniques, 2015, 43(3): 29-34. DOI: 10.11911/syztjs.201503006 |
[6] | Wei Dianju, Jin Junbin, He Qingshui. Fluid Technology for Drilling Horizontal Wells in the High Permeability Carbonate Reservoir of the YD Oilfield[J]. Petroleum Drilling Techniques, 2015, 43(3): 23-28. DOI: 10.11911/syztjs.201503005 |
[7] | Wu Wei, Ling Wenxue, Si Yinghui. Coring Challenges and Solutions in the YD Oilfield[J]. Petroleum Drilling Techniques, 2015, 43(3): 18-22. DOI: 10.11911/syztjs.201503004 |
[8] | Li Menggang, Zhang Huawei, Niu Chengcheng. Casing Program Optimization and Application in Complex Formation of the YD Oilfield[J]. Petroleum Drilling Techniques, 2015, 43(3): 13-17. DOI: 10.11911/syztjs.201503003 |
[9] | He Weiguo, Tang Ming, Wu Liugen. Expandable Casing Drilling and Completion Technology in Deep Sidetracked Horizontal Wells of Tahe Oilfield[J]. Petroleum Drilling Techniques, 2013, 41(5): 62-66. DOI: 10.3969/j.issn.1001-0890.2013.05.012 |
[10] | Li Junwei, Cao Shijing, Song Linsong, Fu Jianmin, Wu Guang. Managed Pressure Drilling Technique for Horizontal Wells in JZ251S Oilfield[J]. Petroleum Drilling Techniques, 2013, 41(2): 119-122. DOI: 10.3969/j.issn.1001-0890.2013.02.023 |