Fine Adjustment Direction of Water Flooding in HighWater Cut Oil Reservoirs of Shengli Oilfield[J]. Petroleum Drilling Techniques, 2011, 39(1): 101-104. DOI: 10.3969/j.issn.1001-0890.2011.01.021
Citation:
|
Fine Adjustment Direction of Water Flooding in HighWater Cut Oil Reservoirs of Shengli Oilfield[J]. Petroleum Drilling Techniques, 2011, 39(1): 101-104. DOI: 10.3969/j.issn.1001-0890.2011.01.021
|
Fine Adjustment Direction of Water Flooding in HighWater Cut Oil Reservoirs of Shengli Oilfield[J]. Petroleum Drilling Techniques, 2011, 39(1): 101-104. DOI: 10.3969/j.issn.1001-0890.2011.01.021
Citation:
|
Fine Adjustment Direction of Water Flooding in HighWater Cut Oil Reservoirs of Shengli Oilfield[J]. Petroleum Drilling Techniques, 2011, 39(1): 101-104. DOI: 10.3969/j.issn.1001-0890.2011.01.021
|